
Engineering manual - SAB 193-233-283 S A-frame (including ATEX)
146/175
008831 en 2022.02
4.
Circulate the oil until the system is free from air bubbles. Close the ball valve, pos. 9.
The oil will now be charged to the unit.
5.
When the desired amount of oil has been charged to the unit, stop the pump and close
the service valve, pos. 106.
6.
Open the ball valve, pos. 9, carefully to equalise the pressure. The hoses can now be
dismantled.
7.
Loosen the non-return valve carefully to equalise the remaining pressure. Remember
to mount the cap nut on the charge valve and to seal the oil barrel if there is any oil left.
Fig. 86: Oil charging
Length: 460 mm
Height: 350 mm
Width: 340 mm
Weight: 22 kg
Part number: 4541.001
3/8”RG
1/4”RG
1/2”RG
7/8”RG
RG= Pipethread
20
7
9
5
1
2
12
Содержание SAB 193 S
Страница 1: ...SAB 193 233 283 S A frame including ATEX Screw compressor units Engineering manual EN...
Страница 2: ......