Evacuation of the refrigeration plant
After pressure testing, the refrigeration plant must be evacuated to remove atmospheric air
and moisture. Evacuation must be carried out on all types of plants, regardless of the refriger-
ant type to be charged to the plant.
Note that HCFC and HFC refrigerants mix only minimally with water. Consequently, it is impor-
tant to carry out evacuation of such plants with particular care.
The boiling point of a liquid is defined as the temperature where the steam pressure equals at-
mospheric pressure. The boiling point of water is 100°C. If the pressure is reduced, the boiling
point will also be reduced.
The following table shows the boiling points of water at very low pressure levels.
Boiling point
of water °C
At pressure
mm Hg
bar
5
10
15
20
6.63
9.14
12.73
17.80
0.0088
0.0122
0.0170
0.0237
For evacuation, use a vacuum pump to empty the plant of air and steam. The vacuum pump
must be able to reduce the pressure to approximately 700 Pa (5 mm Hg mercury column) and
must be fitted with a gas ballast valve. This valve should be used wherever possible to prevent
water vapour condensing in the vacuum pump.
Important!
Never use the refrigeration compressor to evacuate the plant.
To perform an evacuation satisfactorily, the final pressure must be lower than 5 mm Hg. Please
note that water left in the refrigeration plant may freeze if ambient temperatures are lower than
105° C. In such cases it is necessary to supply heat to the component surroundings as ice
evaporates with difficulty.
It is recommended to carry out evacuation as follows:
•
Evacuate to a pressure lower than 5 mm Hg.
•
Blow dry air or nitrogen into the system to a pressure corresponding to atmospheric
pressure.
Never use OXYGEN cylinders
•
Repeat evacuation to reduce pressure to less than 5 mm Hg.
•
Shut off the vacuum pump from the refrigeration plant and check that the pressure does
not rise within the next couple of hours. If the system still contains water, this will evapo-
rate and cause the pressure to rise thereby indicating unsatisfactory evacuation. In
such cases, repeat the above procedure.
7.32
Oil charging
The compressor unit is usually delivered without oil and must therefore be charged with oil be-
fore start-up. The oil is chosen according to the
Sabroe oil recommendation
. Oil charging is
Содержание SAB 193 S
Страница 1: ...SAB 193 233 283 S A frame including ATEX Screw compressor units Engineering manual EN...
Страница 2: ......