background image

ON-DECK MOUNTING INSTRUCTIONS

 

 

1. 

Place the assembled slide on the deck relative to the pool wall.  Ensure that the 
exit flume clears any coping.  Slide may be angled slightly providing all 
dimensions are maintained as noted in the 

Manufacturer’s Placement 

Instructions 

noted in the following section. 

 

2. 

With the slide in its proper location, center punch or otherwise mark through the 
(7) mounting holes at the bottom of the ladder and base so that a visible mark 
is apparent on the concrete. 
 

3. 

Move the assembled slide aside to facilitate drilling of the anchoring holes. 
 

4. 

Using a power drill and a 1/2” concrete drill bit, drill the holes to a depth of 4”.  
Use tape or a marking on the drill bit to ensure that the hole for the anchor is 
drilled to the required depth. Maintain drill hole straight and perpendicular for 
proper holding strength of anchor stud. 

 
 

5. 

Clear the holes of all debris. Assemble anchor with nut and washer so that the 
top of the nut is flush with the top of the anchor.  Move the slide over the holes 
and insert the anchors.  Drive anchor through the slide mounting holes so that 
nut and washer are flush with the surface material. 

 
 

6. 

Expand anchor by tightening nut 3 to 5 turns.  Once anchor is set remove nut 
and install a lock washer, item #

 (3),

 and retighten nut to a torque of 55 ft.-lbs.

 

 

 

 

 

 

 

 

 

Содержание CYCLONE

Страница 1: ...RTERS P O Box 400 1017 S W Berg Parkway Canby Oregon 97013 USA Phone 503 266 2231 Fax 503 266 4334 www srsmith com S R SMITH CYCLONE SLIDES ARE MANUFACTURED FOR INSTALLATION AND USE ON RESIDENTIAL ING...

Страница 2: ...Gasket Installation 7 Cyclone Assembly 8 ON DECK MOUNTING INSTRUCTIONS 9 SLIDE PLUMBING INSTRUCTIONS 10 MANUFACTURER S PLACEMENT INSTRUCTIONS 11 Visit srsmith com for information on the complete line...

Страница 3: ...NTS FOR SIZE OF CONCRETE FOOTING OVERALL HEIGHT OF SLIDE AND BODING OR ELECTRICAL CODES CHECK INSIDE ALL BOXES AND PACKAGING MATERIALS FOR PARTS BEFORE BEGINNING ASSEMBLY READ ALL INSTRUCTIONS AND IDE...

Страница 4: ...ment 6 Observe the position of the exit of the slide as shown in FIGURE F FIGURE G and FIGURE I on pages 11 and 12 MAINTENANCE INSTRUCTIONS 1 When hosing down the deck hose your Cyclone to wash away a...

Страница 5: ...5 ASSEMBLED CYCLONE LAYOUT FIGURE A...

Страница 6: ...1 3 8 LOCK WASHER 2 ea 3 05 14 115 1 2 LOCK WASHER 7 ea 4 5 145 3 8 FLAT WASHER 16 ea 5 5 245 3 8 x 2 1 2 LAG SCREW 10 ea 6 5 240 3 8 x 3 1 2 LAG SCREW 2 ea 7 5 260 3 8 x 6 5 HEX HEAD CAP SCREW 2 ea 8...

Страница 7: ...ke the exposed gasket adhesive and begin at a top edge of the runway section groove While firmly pressing the gasket into the groove intermittently press and remove more paper exposing adhesive until...

Страница 8: ...lower slide sections as shown in FIGURE D in 2 locations b Attach the pedestal as shown in FIGURE D in 4 locations Mark and drill a 1 4 pilot hole in the center of each recess before fasting with the...

Страница 9: ...he anchoring holes 4 Using a power drill and a 1 2 concrete drill bit drill the holes to a depth of 4 Use tape or a marking on the drill bit to ensure that the hole for the anchor is drilled to the re...

Страница 10: ...10 comes in contact with the wall of the Cyclone 7 Gently tilt the swivel 10 away from the slide and complete one more turn to ensure a good insertion 8 Finish turning the swivel 10 with the fitting a...

Страница 11: ...et 9 along the extended centerline of the slide from Pt A as shown in FIGURE F 2 A minimum clearance area in front of the slide shall be maintained at all times as follows A The minimum clearance dist...

Страница 12: ...contained in ANSI APSP ICC 5 2011 STANDARD FOR RESIDENTIAL INGROUND SWIMMING POOLS and refer to FIGURE 3 and Table 1 for Minimum Water Envelope Dimensions AB BC and Width at Point C TABLE 1 Board Mini...

Отзывы: