background image

ASSEMBLY INSTRUCTIONS 

 

Tools Required 

1.  Ratchet handle 
2. 

9/16” deep socket 

3. 

9/16” wrench 

4.  1/2" socket or wrench 
5.  1/2" concrete drill bit 
6.  1/4" drill bit 
7.  Phillips screw driver 
8.  Power drill 
9.  Lint free rag 
10.  Pistol-grip clamp (optional) 

 

Gasket Installation 

 

Clean the groove of the top runway section, shown below, with a damp clean rag and dry 

 

Take the 2 feet of gasket provided with your kit and begin to peel back the paper. Make sure you 
are not removing the adhesive itself from the gasket. 

 

Take the exposed gasket & adhesive and begin at a top edge of the runway section groove. 

 

While firmly pressing the gasket into the groove, intermittently press and remove more paper, 
exposing adhesive, until you have used the entire gasket.  

 

Properly installed, the gasket will extend from one side of the slide to the other and be centered in 
the groove, front to back. 

 

Continue to assemble your Cyclone as described on page 8, and ensure the gasket remains in 
place as you handle the sections

 

 

 

 

 

 

 

 

 

 

 

FIGURE B

 

 

NOTE: 

BE SURE TO APPLY ANTI-SEIZE TO ALL 

FASTENERS TO PREVENT GALLING. 

NOTE: 

Use pistol-grip clamps as necessary to align the molded parts. 

 

 

Top Runway Section 

 

(11) 

 

1. Clean the groove 

2. Place Gasket into 
Groove 

Содержание CYCLONE

Страница 1: ...RTERS P O Box 400 1017 S W Berg Parkway Canby Oregon 97013 USA Phone 503 266 2231 Fax 503 266 4334 www srsmith com S R SMITH CYCLONE SLIDES ARE MANUFACTURED FOR INSTALLATION AND USE ON RESIDENTIAL ING...

Страница 2: ...Gasket Installation 7 Cyclone Assembly 8 ON DECK MOUNTING INSTRUCTIONS 9 SLIDE PLUMBING INSTRUCTIONS 10 MANUFACTURER S PLACEMENT INSTRUCTIONS 11 Visit srsmith com for information on the complete line...

Страница 3: ...NTS FOR SIZE OF CONCRETE FOOTING OVERALL HEIGHT OF SLIDE AND BODING OR ELECTRICAL CODES CHECK INSIDE ALL BOXES AND PACKAGING MATERIALS FOR PARTS BEFORE BEGINNING ASSEMBLY READ ALL INSTRUCTIONS AND IDE...

Страница 4: ...ment 6 Observe the position of the exit of the slide as shown in FIGURE F FIGURE G and FIGURE I on pages 11 and 12 MAINTENANCE INSTRUCTIONS 1 When hosing down the deck hose your Cyclone to wash away a...

Страница 5: ...5 ASSEMBLED CYCLONE LAYOUT FIGURE A...

Страница 6: ...1 3 8 LOCK WASHER 2 ea 3 05 14 115 1 2 LOCK WASHER 7 ea 4 5 145 3 8 FLAT WASHER 16 ea 5 5 245 3 8 x 2 1 2 LAG SCREW 10 ea 6 5 240 3 8 x 3 1 2 LAG SCREW 2 ea 7 5 260 3 8 x 6 5 HEX HEAD CAP SCREW 2 ea 8...

Страница 7: ...ke the exposed gasket adhesive and begin at a top edge of the runway section groove While firmly pressing the gasket into the groove intermittently press and remove more paper exposing adhesive until...

Страница 8: ...lower slide sections as shown in FIGURE D in 2 locations b Attach the pedestal as shown in FIGURE D in 4 locations Mark and drill a 1 4 pilot hole in the center of each recess before fasting with the...

Страница 9: ...he anchoring holes 4 Using a power drill and a 1 2 concrete drill bit drill the holes to a depth of 4 Use tape or a marking on the drill bit to ensure that the hole for the anchor is drilled to the re...

Страница 10: ...10 comes in contact with the wall of the Cyclone 7 Gently tilt the swivel 10 away from the slide and complete one more turn to ensure a good insertion 8 Finish turning the swivel 10 with the fitting a...

Страница 11: ...et 9 along the extended centerline of the slide from Pt A as shown in FIGURE F 2 A minimum clearance area in front of the slide shall be maintained at all times as follows A The minimum clearance dist...

Страница 12: ...contained in ANSI APSP ICC 5 2011 STANDARD FOR RESIDENTIAL INGROUND SWIMMING POOLS and refer to FIGURE 3 and Table 1 for Minimum Water Envelope Dimensions AB BC and Width at Point C TABLE 1 Board Mini...

Отзывы: