700-3002-BC
10.18.2017
READ THESE INSTRUCTIONS IN THEIR ENTIRETY BEFORE BEGINNING INSTALLATION
Prior to opening the any packaging, carefully inspect the external condition of the shipping
materials for any visible damage. It is important that any damage be noted on the Bill of Lading
prior to signing for the delivery. Contact either S.R. Smith or your dealer immediately to notify us
of any damage or missing parts.
Ensure mounting anchor has been installed in the correct location in the pool deck for proper lift
operation. It is recommended that the anchor be installed by a person familiar with installing pool
deck equipment.
The aXs2 Lift requires only simple assembly, using common tools for installation and setup. Position
pallet close to deck anchor for easier assembly and set up.
TOOLS REQUIRED FOR LIFT ASSEMBLY
BOX WRENCHES (2) – 9/16”
BOX WRENCH (2) – 1/2”
Unpacking & Assembly Procedure for the aXs2:
1. Carefully remove lift components from packaging.
2. Remove seat assembly (#15) and frame (#14) and set aside
for attachment.
3. Remove Deck Anchor securing bolt from Deck Anchor (#24),
and set aside.
4. Remove Mast Assembly (#11) from packaging and place into
deck anchor (#24), aligning the welded Tab on the Base with
its slot to the hole in the Deck Anchor.
5. Remove and unwrap Hand Control (#6) from accessory carton.
6. Insert Hand Control (#6) plug into large connector on the Control Box (see image below) and
temporarily hang Hand Control over flange on Mast. Make sure plug is keyed to keyway and is
secure.
(#24)
Mast Base & Tab
Remove Deck Anchor Cover
and Securing Bolt & Washer
HAND CONTROL
(largest Plug)
MOTOR CONTROL
(with Red Stripe)
ACTUATOR CONTROL
(with Green Stripe)
Содержание aXs2
Страница 23: ...700 3002 BC 10 18 2017 APPENDIX A...
Страница 24: ...700 3002 BC 10 18 2017 APPENDIX B...