5
Installation Checklist
REFER TO INSTALLATION INSTRUCTIONS
GAS SUPPLY
______ Correct pipe size (record size)
______ Correct supply pressure (during furnace operation) (record pressure)
______ Manifold pressure (record upstream pressure)
______ No gas leaks
______ L.P. Kit Number (if applicable) (record kit number)
ELECTRICAL
______ 115 V.A.C. supply (Dedicated Circuit) (record voltage)
______ Polarity observed
______ Furnace properly grounded
______ Correct wire size (record type and gauge)
FURNACE INSTALLATION
______ Correct clearance to combustibles (record clearance)
______ Correct clearance for service (at front) (record clearance)
DUCT STATIC PRESSURE
______ in. w.c. on heating speed (record static pressure)
______ in. w.c. on cooling speed (record static pressure)
______ Air temperature rise in heat (record air temperature rise)
______ Air temperature rise in cool (record air temperature rise)
VENTING
______ Correct vent pipe diameter and length (according to NFGC tables) _________________ Vent connection size
______ Correct venting material (according to NFGC tables)
______ Correct lining for masonry chimneys
______ Adequate clearance from combustibles
______ Proper negative pressure reading in the vent
______ Vent pipe secured to induced draft blower housing
COMBUSTION AIR
______ Proper source of combustion air
______ Correct combustion air opening size
______ Optional attic combustion air pull
______ Non-attic combustion air pull
Ch
eck
list
Installation Instructions remain with the furnace as a reference guide to the servicing contractor. We recommend
that performance and installation data be recorded for future reference on this sheet to meet service and warranty
obligations so that job site information is available when required.
Содержание 801MSP Series
Страница 52: ...52 CM 0614 ...