background image

·

 

 

 

2  Preparation before Installation 

 

To avoid body injury and equipment damage, please carefully read the safety suggestions before you install 

RSR30-X. 

 

The following safety suggestions do not cover all possible dangers. 

2.1  General Suggestions 

Routers are important network hops and their working affects the normal operation of the whole network. 

The following suggestions are advised for the installation and use of routers: 

 

Do not place the router in a wet place and prevent any liquid from entering into it. 

 

Install the router in a place away from heating sources 

 

Make sure the normal grounding. 

 

Wear anti-static wrist straps to install or maintain routers 

 

Do not plug/unplug routers' modules when power on 

 

Do not unplug routers' power cables when power on 

 

Do not wear loose clothes to avoid hooking any parts. Before operation, tighten your band, shawl, and sleeves. 

 

Put the tools and parts away from where people walk by. 

 

Use UPS to prevent power failure and other interferences 

2.1.1  Electrical Safety 

 

Please observe local regulations and specifications when performing electrical operations. Relevant operators 

must be qualified. 

 

Please carefully check for any potential danger in the working area, for example, ungrounded power supply, 

unreliable grounding of the power supply and damp/wet ground or floor. 

 

Find out the location of the emergency power supply switch in the room before installation. First cut off the power 

supply in case of an accident. 

 

Be sure to make a careful check before you shut down the power supply. 

 

Do not place the equipment in a damp/wet location. Do not let any liquid enter the chassis 

 

Any nonstandard and inaccurate electrical operation can cause an accident such as fire or electrical attack, thus 

causing severe even fatal damages to human bodies and equipment. 

 

Direct or indirect touch through a wet object on high-voltage and mains supply can bring a fatal danger. 

2.1.2  Laser Safety 

Among the modules supported by RG-N18000, there are a great number of optical modules that are Class I laser 

products. 

Precautions: 

Содержание RSR30-X-SPU10

Страница 1: ...RSR30 X Series Router Hardware Installation and Reference Guide...

Страница 2: ...m or by any means without the prior written consent of Ruijie Networks is prohibited Exemption statement This document is provided as is The contents of this document are subject to change without any...

Страница 3: ...http community ruijienetworks com Technical Support Email service_rj ruijienetworks com Skype service_rj ruijienetworks com Related Documents Documents Description Configuration Guide Describes networ...

Страница 4: ...dustries such as telecommunications private network ISP finance tax public security and railways as well as middle and large sized enterprises The RSR30 X has the following features Reliability advanc...

Страница 5: ...rt both service modules and power supplies support hot swapping Power Redundancy Support Memory DDR 2 GB FLASH 512 MB I O Interface Ethernet interface Nine GE ports GE 0 0 0 0 0 8 that support auto ne...

Страница 6: ...or is not properly inserted or the module can be unplugged Blinking green The module is initializing Solid green Initialization is complete and the module is operational SD SD card status indicator O...

Страница 7: ...d either is available at a time The port for mini USB is the mini USB B connector and only the 5 pin mini B connector or compatible connector cable can be used To use the U Console port install the de...

Страница 8: ...ly when no SD card is inserted or no installation package is available on the SD cards If no installation package is available on the inserted SD card and USB flash disk the system resets and but does...

Страница 9: ...Figure 1 3 Appearance of Two M5000E AC60 Power Supply Modules Indicators Indicator Description Indicator on the panel Green Power output is normal Red Power output is abnormal Off There is NO power o...

Страница 10: ...ecifications of the M5000E AC60 Module Module Model RG PD240I Rated Voltage Range 36VDC 72VDC Power 60W Hot Swapping Supported Power Redundancy Supporting 1 1 power redundancy Overvoltage Protection 1...

Страница 11: ...e UPS to prevent power failure and other interferences 2 1 1 Electrical Safety Please observe local regulations and specifications when performing electrical operations Relevant operators must be qual...

Страница 12: ...perature and humidity in the equipment room If the humidity is high for a long time mechanical changes like faulty insulation or even electrical leakage may occur If the relative humidity is low the i...

Страница 13: ...d resist interference Please carefully check the grounding conditions on the installation site according to the grounding requirements and perform grounding properly as needed Safety Grounding The equ...

Страница 14: ...ng protection 2 2 8 Checking Installation Location Whether the router is installed in a cabinet or placed on a workbench make sure There is enough room at the inlet wind gap and the vent of the router...

Страница 15: ...PC with hyper terminal installed Router modules Power sockets Some tools are customer supplied 3 Router Installation 3 1 Procedure for Installing Router Please follow the following procedure to instal...

Страница 16: ...routers The module to be installed is the M5000E AC60 power module 1 Place the router in such a way that you face the rear panel of its host 2 Remove the empty barrier on the slot where the power mod...

Страница 17: ...he power supply socket should be installed near the device for convenient plugging 3 4 Installing the Grounding Cable and the Power Cable Ruijie RSR30 X series routers support the following AC power s...

Страница 18: ...ct one end of the supplied power cable to the socket on the rear panel of the cabinet and another to the AC power socket 2 Turn the router to power on position 3 Check the power indicator on the front...

Страница 19: ...terminal block in the chassis Figure 3 2 PD240I Power Plug Installation The installation procedures are as follows 1 Take the DC power module PD240I and cables from the carton and insert the DC power...

Страница 20: ...r cables are correctly installed before you power the device on Before installing the power module ensure that the power switch is off 3 6 2 Removing the DC Power Module Note This section applies to t...

Страница 21: ...the same port and either is available at a time The 4 pin mini B USB may be easily confused with the 5 pin mini B USB Only the 5 pin mini B connector can be used 4 Router Startup and Configuration 4 1...

Страница 22: ...at you may cut power supply in time in case of accident 4 1 2 2 Powering on Router Turn the router to the power on position 4 1 2 3 Check after Powering on After powering on the router please check If...

Страница 23: ...5 MTD_NAND_FOUND 1 NAND chips chip size 536870912 detectedCopyright c 1998 2014s by Ruijie Networks All Rights Reserved Neither Decompiling Nor Reverse Engineering Shall Be Allowed Jan 1 00 02 29 SYS...

Страница 24: ...er 4 during the start will appear on the terminal If a fault occurs nothing or illegible characters will appear If no information appears on the terminal display please check If the power system is wo...

Страница 25: ...pasted on the curved position or other positions that may affect the installation The text on a label must be in the format from left to right or from up to down as shown in Figure 6 1 Details are as...

Страница 26: ...the two ports connected by the cable Write the content based on the onsite environment 1 Write information about the local end in Area 1 2 Write information about the peer end in Area 2 3 Area 3 will...

Отзывы: