After setting the parameters, click
OK
to enter the super terminal page.
Power-on Startup
Checking before Power-on
The switch is fully grounded.
The power cable is correctly connected.
The power supply voltage complies with the requirement of the switch.
The console cable is correctly connected; the terminal (can be a PC) used for configuration is already started; the
parameters are already configured.
Checking after Power-on (Recommended)
After power-on, you are recommended to perform the following checks to ensure the normal operation of follow-up
configurations.
Check that information is displayed on the terminal interface.
Check that the device indicator is normal.
Содержание RG-S5750-S Series
Страница 1: ...RG S5750 S Series Switch Hardware Installation and Reference Guide V1 15...
Страница 27: ...The RG S5750 S series are not provided with a tool kit Please prepare tools on your own...
Страница 39: ...Symptom Possible Causes Solution The RPS power supply cable is in loose contact cable is in loose contact...