Checking after Installation
Before checking the installation, switch off the power supply to avoid any personal injury or damage to the
component due to connection errors.
Check that the ground line is connected.
Check that the cables and power input cables are correctly connected.
Check that all interface cables are laid out inside the equipment room. In the case of external cabling, check that
the lightning resistance socket or network interface lightning protector is connected.
Check that sufficient airflow is available around the device (over 10 cm).
Содержание RG-S5750-S Series
Страница 1: ...RG S5750 S Series Switch Hardware Installation and Reference Guide V1 15...
Страница 27: ...The RG S5750 S series are not provided with a tool kit Please prepare tools on your own...
Страница 39: ...Symptom Possible Causes Solution The RPS power supply cable is in loose contact cable is in loose contact...