Whether power cables are already laid out and whether the requirements of electrical current are met
Whether related network cables are already laid out
Installing the RG-S5750-S Series
Precautions
Following matters must be noted before installation:
Connect the power cables of different colors to the corresponding grounding posts.
Ensure that the connected power cables have sound contact.
Do not place heavy items on the switch.
Reserve a spacing of at least 10 cm around the chassis for good ventilation. Do not stack the devices.
The switch should be located far away from the large power radio launch pad, radar launch pad, and
high-frequency large-current devices. If necessary, electromagnetic shielding should be adopted. For example,
use interface cables to shield cables.
Interface cables should be laid inside the equipment room. Outdoor cabling is prohibited, avoiding damages to
device signal interfaces caused by over-voltage or over-current of lightning.
Mounting the Switch in a Standard 19-inch Rack
The RG-S5750-S series switches are designed with the EIA standard dimensions and can be installed in 19-inch rack.
The installation is as follows:
Step 1: Attach the mounting brackets to the switch with the supplied screws, as shown in Figure 3-1.
Figure 3-1 Attaching the Mounting Bracket to the Switch
Содержание RG-S5750-S Series
Страница 1: ...RG S5750 S Series Switch Hardware Installation and Reference Guide V1 15...
Страница 27: ...The RG S5750 S series are not provided with a tool kit Please prepare tools on your own...
Страница 39: ...Symptom Possible Causes Solution The RPS power supply cable is in loose contact cable is in loose contact...