4.3 Identification 

The H2O is shown in Figure 2. Each H2O is 

uniquely identified by its MAC address. This is 

printed inside the top cover and is also visible 

as the Wifi hotspot name when the device is in 

hotspot mode.

5.1 Safety and isolation

As the H2O is installed into a building’s electrical 

infrastructure and also has both AC and DC 

power supplies, it is necessary to ensure that 

the installation area is secured and safe before 

beginning the installation. 

To install the H2O, follow these steps:

Begin by making sure that the AC supply is 

fully isolated, either at the main breaker, RCD 

or dedicated isolation device. Then ensure that 

the DC PV supply is also fully isolated. Ensure 

that supplies are also locked out to prevent 

accidental reconnection, as necessary.

5.2 Installation of the H2O

Note that the H2O will generate some heat and 

it is necessary to take that into consideration 

when choosing your installation location.

To begin your H2O installation, locate a suitable 

position  for  it  which  fulfills  all  the  following 

criteria:

»

A firm, even vertical surface

»

A location that is fully indoors

»

Free from excessive dust and moisture

»

Has free airflow and at least 300mm

clearance all around

»

Is not subjected to heat generated by

another device (eg: above a cooker or

directly adjacent to the geyser)

»

It may not be mounted inside a cupboard or

other place without free airflow.

»

Is within reach of the 10m temperature

probe’s maximum length.

»

Not directly below the Geyser where it may

be splashed by any geyser leak event or in the

case of maintenance work.

The H2O may not be mounted horizontally or 

at an oblique angle. It must be mounted with 

the terminal chamber at the bottom of the front 

cover (ie: correctly rotated) 

The H2O may not be installed within the ceiling 

or roof cavity.

Mount the supplied bracket with suitable fixings 

to  the  identified  surface  and,  having  done  so, 

ensure that it is firm and secure. 

Attach the H2O to its bracket by positioning it 

over the hooks and sliding it downwards. There 

should be a small gap between the bracket and 

the rear surface of the H2O’s housing to allow 

for sufficient airflow. 

5.3 Electrical installation

Depending on whether this is a new or existing 

geyser installation, follower either the steps 

labelled “

Existing installations

” or “

New 

installations” below.

Note that the H2O can be used off-grid, without 

an AC supply. In this case, ignore instructions 

relating to the AC supply below.  

Note that, depending on where the H2O is 

mounted, the following steps may differ.

Содержание Synapse H2O

Страница 1: ...Synapse H2O PV Geyser Controller Technical Manual www rubiconsa com...

Страница 2: ...0 General safety requirements 7 3 11 Local requirements 7 3 12 Other considerations 7 4 Device description 8 4 1 Overview and description 8 4 2 Identification 8 5 Installation 9 5 1 Safety 9 5 2 Insta...

Страница 3: ...Figure 1 below shows a typical installation 1 1 Contents of the box Inside the box you should find 1 x Synapse H2O controller 1 x mounting bracket 1 x securing screw 1 x temperature probe 1 x pair MC...

Страница 4: ...ximum Power Output 1500W MPPT Range 130 220VDC depends on element Connection MC4 Solar Connectors Installation Pre requisites External PV Isolator and SPD protection Voltage 60 220V Modulated DC varia...

Страница 5: ...d to IEC 60730 ICASA RF approval pending CE Self Certified for EMC Safety IEC 60950 1 Electrical Safety Designed to Class B IEC 60730 Maximum Ambient Temperature 0 C to 30 C full output limited output...

Страница 6: ...staff lies with the company that the staff work for It is also the responsibility of the company to assess the ability of the worker to carry out any kind of work and ensure their safety Staff must co...

Страница 7: ...10 general safety requirements Operator The person in charge of handling the electrical device is responsible for the safety of persons and property Avoid accidental re connection of the system using...

Страница 8: ...the LED indicators please see the Operation section of the manual For more detailed information on the LED indicators please see the Operation section of the manual Figure 2 H2O PV geyser controller R...

Страница 9: ...as free airflow and at least 300mm clearance all around Is not subjected to heat generated by another device eg above a cooker or directly adjacent to the geyser It may not be mounted inside a cupboar...

Страница 10: ...or the local isolator depending on local regulations Ensure that the Live Neutral and Earth conductors are all connected securely and according to the labels on the H2O and the Geyser Ensure that the...

Страница 11: ...ectors on the H2O See Fig 5 Ensure that the H2O is protected with Surge Protection Devices SPD s on both the AC and DC supply interfaces Temperature sensor The H2O is supplied with a temperature senso...

Страница 12: ...stem will remain below dangerous temperature levels To do this set the original mechanical thermostat marginally above the desired setpoints of the system but still within safe limits For example if t...

Страница 13: ...and the user app see section 7 AC setpoint 55 C Solar setpoint 55 C Boost setpoint 55 C Note it is recommended that an internet connection is used and commissioned as it enables full diagnostics and c...

Страница 14: ...py of which is available at www rubiconsa com H2O 7 Mobile applications and WiFi connectivity 7 1 APP introduction The Synapse H2O can be commissioned configured and monitored via the included Mobile...

Страница 15: ...ubiconsa com Once accredited an installer can enrol a site by opening the Installer s app with a mobile web browser from https rubicon installation web app login and logging in with the credentials yo...

Страница 16: ...eps have been completed tap the submit button Step 5 Finalise installation documentation This step gives the PDF summary document time to generate and download The installer must confirm the Installat...

Страница 17: ...main PCB for 3 seconds 7 4 User s App Synapse H2O is managed monitored and controlled with the H2O User s app The User s Application requires a Synapse H2O s user to have been enrolled by a Qualified...

Страница 18: ...s You can change the temperature setpoints for Grid Solar and Boost modes here Support Contact Rubicon for support from here Menu Energy consumption This view allows you to visualise your energy usage...

Страница 19: ...elow the Login button 7 4 1 Forgotten password If a user forgets or loses their password it can be reset Enter this link in a mobile device s browser https rubicon iot dev web app login In the screen...

Страница 20: ...sa com Port Elizabeth 4 Reith Street Sidwell Port Elizabeth Eastern Cape 6061 27 41 451 4359 salespe rubiconsa com East London Unit 1 Aloe Industrial Park Motor City Bonza Bay Road Beacon Bay East Lon...

Отзывы: