Rubicon Synapse H2O Скачать руководство пользователя страница 18

H2O Manual | 18

Menu: Function View

The Function View is where you can interact 

with your Synapse H2O.

Boost:

 The Synapse H2O will heat the water 

to the Boost setpoint in the shortest possible 

time, which will use AC power. Tap again to 

deactivate Boost. 

Turn Grid Off: 

This disables the use of grid power 

for heating your water, even if it is available. Tap 

again to deactivate. 

Away: 

This will stop heating your water from 

all sources until deselected and the H2O is on 

standby. Tap again to deactivate Away mode.

Notifications: All errors or other notifications will 

be displayed here. 

Settings:

 You can change the temperature 

setpoints for Grid, Solar and Boost modes here.

Support: Contact Rubicon for support from here.

Menu: Energy consumption

This view allows you to visualise your energy 

usage statistics by the different modes, filtered 

by your preferred period. 

To view the graph, select a start and end date 

and then tap Get Data. 

It is also possible to view the last 7 days’ history 

in bar graph format by tapping the Seven Days 

tab.

Menu: Geyser activity

The Geyser Activity view enables the user to 

view the geyser’s temperature and heating 

cycles by source graphically over a period. 

To create a graph, select start and end dates and 

then tap Get Data. Once the graph is displayed, 

you can turn each power source’s activity on or 

off by tapping either the grid or solar icons.

Содержание Synapse H2O

Страница 1: ...Synapse H2O PV Geyser Controller Technical Manual www rubiconsa com...

Страница 2: ...0 General safety requirements 7 3 11 Local requirements 7 3 12 Other considerations 7 4 Device description 8 4 1 Overview and description 8 4 2 Identification 8 5 Installation 9 5 1 Safety 9 5 2 Insta...

Страница 3: ...Figure 1 below shows a typical installation 1 1 Contents of the box Inside the box you should find 1 x Synapse H2O controller 1 x mounting bracket 1 x securing screw 1 x temperature probe 1 x pair MC...

Страница 4: ...ximum Power Output 1500W MPPT Range 130 220VDC depends on element Connection MC4 Solar Connectors Installation Pre requisites External PV Isolator and SPD protection Voltage 60 220V Modulated DC varia...

Страница 5: ...d to IEC 60730 ICASA RF approval pending CE Self Certified for EMC Safety IEC 60950 1 Electrical Safety Designed to Class B IEC 60730 Maximum Ambient Temperature 0 C to 30 C full output limited output...

Страница 6: ...staff lies with the company that the staff work for It is also the responsibility of the company to assess the ability of the worker to carry out any kind of work and ensure their safety Staff must co...

Страница 7: ...10 general safety requirements Operator The person in charge of handling the electrical device is responsible for the safety of persons and property Avoid accidental re connection of the system using...

Страница 8: ...the LED indicators please see the Operation section of the manual For more detailed information on the LED indicators please see the Operation section of the manual Figure 2 H2O PV geyser controller R...

Страница 9: ...as free airflow and at least 300mm clearance all around Is not subjected to heat generated by another device eg above a cooker or directly adjacent to the geyser It may not be mounted inside a cupboar...

Страница 10: ...or the local isolator depending on local regulations Ensure that the Live Neutral and Earth conductors are all connected securely and according to the labels on the H2O and the Geyser Ensure that the...

Страница 11: ...ectors on the H2O See Fig 5 Ensure that the H2O is protected with Surge Protection Devices SPD s on both the AC and DC supply interfaces Temperature sensor The H2O is supplied with a temperature senso...

Страница 12: ...stem will remain below dangerous temperature levels To do this set the original mechanical thermostat marginally above the desired setpoints of the system but still within safe limits For example if t...

Страница 13: ...and the user app see section 7 AC setpoint 55 C Solar setpoint 55 C Boost setpoint 55 C Note it is recommended that an internet connection is used and commissioned as it enables full diagnostics and c...

Страница 14: ...py of which is available at www rubiconsa com H2O 7 Mobile applications and WiFi connectivity 7 1 APP introduction The Synapse H2O can be commissioned configured and monitored via the included Mobile...

Страница 15: ...ubiconsa com Once accredited an installer can enrol a site by opening the Installer s app with a mobile web browser from https rubicon installation web app login and logging in with the credentials yo...

Страница 16: ...eps have been completed tap the submit button Step 5 Finalise installation documentation This step gives the PDF summary document time to generate and download The installer must confirm the Installat...

Страница 17: ...main PCB for 3 seconds 7 4 User s App Synapse H2O is managed monitored and controlled with the H2O User s app The User s Application requires a Synapse H2O s user to have been enrolled by a Qualified...

Страница 18: ...s You can change the temperature setpoints for Grid Solar and Boost modes here Support Contact Rubicon for support from here Menu Energy consumption This view allows you to visualise your energy usage...

Страница 19: ...elow the Login button 7 4 1 Forgotten password If a user forgets or loses their password it can be reset Enter this link in a mobile device s browser https rubicon iot dev web app login In the screen...

Страница 20: ...sa com Port Elizabeth 4 Reith Street Sidwell Port Elizabeth Eastern Cape 6061 27 41 451 4359 salespe rubiconsa com East London Unit 1 Aloe Industrial Park Motor City Bonza Bay Road Beacon Bay East Lon...

Отзывы: