34
M0605-1 ver 2.5
4.1.5 Activities and intervals on tool attachment
Equipment
Maintenance
activity
Interval
Description
Tool attachment
Inspection
2 weeks
Visual inspection of tool attachment (see section
4.2.2).
Tool attachment
Cleaning
1 month
Cleaning of tool attachment, interval depending
on the environment (see section 4.3.2).
Grooves
Cleaning
1 month
Wipe the grooves for the locking balls clean (see
section 4.3.2).
Signal contacts
Cleaning
1 month
Wipe the contact surface clean (see section
4.3.2).
4.2 Visual inspection
4.2.1 Inspection of the swivel with tool changer
Visually check the following:
Check
Note
Air connections
Not damaged or dirty
Air sealings
No wear, not damaged or dirty
Electrical connection (STC350-6E only)
Not damaged or dirty
Signal pins (STC350-6E only)
No wear, not damaged or dirty
Cables (STC350-6E only)
No wear, not damaged
Locking balls
Greased, not dirty
All parts
No wear, not damaged or dirty
4.2.2 Inspection of the tool attachment
Visually check the following:
Check
Note
Air connections
Not damaged or dirty
Contact surface of air sealings
Not damaged or dirty
Signal contact surface (TA350-8E only)
No wear, not damaged or dirty
Electrical connection (TA350-8E only)
Not damaged or dirty
Cables (TA350-8E only)
No wear, not damaged
All parts
No wear, not damaged or dirty
Содержание STC350
Страница 2: ...2 M0605 1 ver 2 5 ...
Страница 20: ...20 M0605 1 ver 2 5 2 1 9 Pneumatic diagram ...
Страница 21: ...M0605 1 ver 2 5 21 2 1 10 Circuit diagram E0167 006 for P0607 and P0695A ...
Страница 22: ...22 M0605 1 ver 2 5 2 1 11 Circuit diagram E0166 003 for P0608 ...
Страница 23: ...M0605 1 ver 2 5 23 2 1 12 Circuit diagram E0166 005 for P0604 ...
Страница 41: ...M0605 1 ver 2 5 41 5 SPARE PARTS 5 1 Part list for swivel with tool changer P0605 P0607 and P0695A ...
Страница 46: ...46 M0605 1 ver 2 5 ...
Страница 47: ...M0605 1 ver 2 5 47 ...
Страница 48: ...48 M0605 1 ver 2 5 ...