M0619-1 ver 2.6
31
4.1.5 Activities and intervals on tool attachment
Equipment
Maintenance
activity
Interval
Description
Tool attachment
Inspection
2 weeks
Visual inspection of tool attachment (see section
4.2.2).
Tool attachment
Cleaning
1 month
Cleaning of tool attachment, interval depending
on the environment (see section 4.3.2).
Grooves
Cleaning
1 month
Wipe the grooves for the locking balls clean (see
section 4.3.2).
Signal contacts
Cleaning
1 month
Wipe the contact surface clean (see section
4.3.2).
4.2 Visual inspection
4.2.1 Inspection of the tool changer
Visually check the following:
Check
Note
Air sealings
Not worn, damaged or dirty
Locking balls
Greased. Not dirty
O-ring
Not damaged or dirty
Signal pins (TC250-8E only)
Not worn, damaged or dirty
Cables (TC250-8E only)
Not squeezed or damaged
All parts
No wear
All parts
No damage
All parts
No dirt
4.2.2 Inspection of the tool attachment
Visually check the following:
Check
Note
Air sealing contact surface
Not damaged or dirty
Signal contact surface (TA250-8E only)
Not worn or dirty
Cables (TA250-8E only)
Not squeezed or damaged
All parts
No wear
All parts
No damage
All parts
No dirt
Содержание P6411
Страница 2: ...2 M0619 1 ver 2 6 ...
Страница 19: ...M0619 1 ver 2 6 19 2 1 9 Pneumatic diagram for tool changers P6411 and P6412 ...
Страница 20: ...20 M0619 1 ver 2 6 2 1 10 Circuit diagram E0196 001 for P6412 ...
Страница 21: ...M0619 1 ver 2 6 21 2 1 11 Circuit diagram E0196 002 for P6418 ...
Страница 22: ...22 M0619 1 ver 2 6 2 1 12 Circuit diagram E0196 009 for P6431 and P6473 ...
Страница 41: ...M0619 1 ver 2 6 41 ...
Страница 42: ...42 M0619 1 ver 2 6 ...