M0604-1 ver. 2.3
29
4.1.4 Activities and intervals on tool changer
Equipment
Maintenance
activity
Interval
Description
Tool changer
Inspection
2 weeks
Visual inspection of tool changer (see section
4.2.1).
Tool changer
Cleaning
1 month
Cleaning of tool changer, interval depending on
the environment (see section 4.3.1).
Guide pin
Clean and
lubricate
1 month
Wipe the pins clean and add new lubrication
(see section 4.3.1).
Air sealings
Replace
18 months
Wear parts, interval is depending on number of
tool changes and the environment (see section
4.4.1).
Signal pins
Replace
18 months
Wear parts, interval is depending on number of
tool changes and the environment (see section
4.4.2).
O-ring
Replace
18 months
Wear parts, interval is depending on number of
tool changes and the environment (see section
4.4.3).
Tool changer
Service
5 years
Complete service, to be done by Robot System
Products (see section 4.5).
4.1.5 Activities and intervals on tool attachment
Equipment
Maintenance
activity
Interval
Description
Tool attachment
Inspection
2 weeks
Visual inspection of tool attachment
(see section
4.2.2).
Tool attachment
Cleaning
1 months
Cleaning of tool attachment, interval depending
on the environment
(see section 4.3.2)
.
Grooves
Cleaning
1 months
Wipe the grooves for the locking balls (
see
section
4.3.2).
Signal contacts
Cleaning
1 months
Wipe the contact surfaces clean (
see section
4.3.2).
Содержание P0602
Страница 2: ...2 M0604 1 ver 2 3 ...
Страница 18: ...18 M0604 1 ver 2 3 2 1 8 Pneumatic diagram Pne0166 001A ...
Страница 19: ...M0604 1 ver 2 3 19 2 1 9 Circuit diagram E0166 001B for P0603 and P0608 ...
Страница 20: ...20 M0604 1 ver 2 3 2 1 10 Circuit diagram E0166 005D for P0604 ...
Страница 36: ...36 M0604 1 ver 2 3 5 SPARE PARTS 5 1 Part list for tool changer P0601 and P0603 ...
Страница 41: ...M0604 1 ver 2 3 41 ...
Страница 42: ...42 M0604 1 ver 2 3 ...