M0720-1 ver 3.4
21
2.8 Mounting of TA ground socket, P7147
Action
Note
1
Mount TA ground socket
Mount the ground socket in the
tool changer with enclosed screw.
NOTE!
Apply a small amount
contact grease bef ore mounting.
NOTE!
The dedicated hole can be
f ound close to the RSP label.
2
Mount PE label
Mount the enclosed PE label in
the dedicated area close to the
RSP label.
3
Mount PE cabling
Mount the tools earth cable with
either an M8 or an M5 screw.
NOTE!
The dedicated screw holes
are situated close to the PE
marking.
Содержание M0720-1
Страница 2: ...2 M0720 1 ver 3 4 ...
Страница 63: ...M0720 1 ver 3 4 63 ...
Страница 64: ...64 M0720 1 ver 3 4 ...