20
M0720-1 ver 3.4
2.7 Mounting of TC ground socket, P7239
Action
Note
1
Mount TC ground socket
Mount the ground socket in the
tool changer with enclosed screw
and washers.
NOTE!
Apply a small amount
contact grease bef ore mounting.
2
Mount PE label
Mount the enclosed PE label in
the dedicated area close to the
RSP label.
3
Mount PE cabling
Mount the robots earth cable with
either an M8 or an M5 screw.
NOTE!
The dedicated screw holes
are situated close to the PE
marking.
Содержание M0720-1
Страница 2: ...2 M0720 1 ver 3 4 ...
Страница 63: ...M0720 1 ver 3 4 63 ...
Страница 64: ...64 M0720 1 ver 3 4 ...