
66
April 2015
IMO_374_EN_v1
Roto Patio Fold
Subject to change.
Installation
Frame
Drilling and routing dimensions, surrounding frame
25
14.5
Drilling for fixing connecting-link for stay bearing / swivel
bearing (S.kg > 90 kg)
Jig for stay bearing and pivot rest
638665
1.
Position the drilling jig at the cams in the frame.
2.
Drill the hole:
1 x
Ø
3.9 mm, depth min. 14 mm.
NOTES!
The description refers to the surrounding
frame.
Wall-thickness ≥ 6 mm (with corner connector
).
On solid material drill out to Ø 4.1 mm.
25
14.5
Drilling for pivot rest (SH > 2400 mm)
Jig for stay bearing and pivot rest
638665
1.
Position the drilling jig at the cams in the frame.
2.
Drill the hole:
1 x
Ø
3.9 mm, depth min. 14 mm.
NOTES!
The description refers to the surrounding
frame.
Wall-thickness ≥ 6 mm (with corner connector
).
On solid material drill out to Ø 4.1 mm.
4.5
4.5
max. 5
45°
max. 5
Alternatively:
Routing for the sash corners
1.
Open all sash corners of the connecting-rod groove
according to the drawing.
NOTE!
Ensure burr-free edges.
Содержание Patio Fold
Страница 2: ...2 April 2015 IMO_374_EN_v1 Roto Patio Fold Subject to change ...
Страница 32: ...32 April 2015 IMO_374_EN_v1 Roto Patio Fold Subject to change 13 Hardware overview Version enhanced threshold ...
Страница 35: ...Subject to change Roto Patio Fold IMO_374_EN_v1 April 2015 35 Hardware overview Parts list enhanced threshold ...
Страница 73: ...Subject to change Roto Patio Fold IMO_374_EN_v1 April 2015 73 Installation drawings Dimensions and positioning ...
Страница 89: ...Subject to change Roto Patio Fold IMO_374_EN_v1 April 2015 89 ...
Страница 90: ...90 April 2015 IMO_374_EN_v1 Roto Patio Fold Subject to change ...