62
April 2015
IMO_374_EN_v1
Roto Patio Fold
Subject to change.
4a
4b
4a
4b
Pull off the adhesive film on the cover cap before
placing it onto the threshold.
Secure the cover cap.
NOTE!
The screws shown are in the misc. small
components pack of the enhanced threshold.
5a
5b
5a
5b
Secure the threshold bracket with self-tapping
screws.
NOTE!
The screws shown are in the misc. small
components pack of the enhanced threshold.
Seal the relevant surfaces.
6.
Secure the frame.
Recommendation: Self-tapping screws (choice on site)
ISO 7050 – ST 4.2 x ... – C – Z, stainless steel A2
NOTE!
Harmonise the length of the screws to the
conditions at the installation site.
NOTE!
Seal the holes for the outer fastenings with
suitable sealing compound to prevent the
ingress of water.
Installation
Frame
Installing the frame counter-routed
Содержание Patio Fold
Страница 2: ...2 April 2015 IMO_374_EN_v1 Roto Patio Fold Subject to change ...
Страница 32: ...32 April 2015 IMO_374_EN_v1 Roto Patio Fold Subject to change 13 Hardware overview Version enhanced threshold ...
Страница 35: ...Subject to change Roto Patio Fold IMO_374_EN_v1 April 2015 35 Hardware overview Parts list enhanced threshold ...
Страница 73: ...Subject to change Roto Patio Fold IMO_374_EN_v1 April 2015 73 Installation drawings Dimensions and positioning ...
Страница 89: ...Subject to change Roto Patio Fold IMO_374_EN_v1 April 2015 89 ...
Страница 90: ...90 April 2015 IMO_374_EN_v1 Roto Patio Fold Subject to change ...