ROTEX Heating Systems GmbH
30
5.6.8
Vertical roof terminal and vertical double pipe flue system
Unit category: C33
CAUTION
If the vertical combi feedthrough cannot be applied, the air
supply and combustion gas outlet must be carried out
separately.
•
Vertical combi feedthrough
Permitted pipe length
For parallel: Air supply and combustion gas outlet together, excluding the length of
the combi feedthrough.
For concentric: total pipe length, excluding the length of the combi feedthrough.
Parallel
Concentric
60/100
Concentric
80/125
RKOMB22AAV1
100 m
11 m
29 m
RKOMB28AAV1
85 m
10 m
29 m
RKOMB33AAV1
80 m
10 m
29 m
Combustion gas outlet and air supply pipe
For assembly, see par. 5.6.5 General assembly.
Assembly vertical roof terminal
1.
Fit a vertical feed-through panel with scale at the location of the outlet on a
sloped roof.
A flat roof requires an adhesive panel for a Ø126 mm pipe.
2.
Disassemble the manifold from the combi feedthrough.
3.
Slide the combi feedthrough from outside to inside:
In case of a sloped roof, through the vertical feed-through panel with scale.
In case of a flat roof, through the adhesive panel.
4.
In case of a parallel connection, fit the manifold of the combi feedthrough and
secure it with a sheet metal screw or pop rivet.
Содержание RKOMB22AAV1
Страница 1: ...ROTEX Heating Systems GmbH RKOMB22AAV1 RKOMB28AAV1 RKOMB33AAV1 Installation instructions English...
Страница 3: ......
Страница 57: ......
Страница 58: ......
Страница 59: ......
Страница 60: ...885537 4P374377 1A...