ROTEX Heating Systems GmbH
33
5.6.10
Roof outlet and air supply from the facade
Unit category: C53
CAUTION
The air supply in the facade must be fitted with an inlet grid
(A).
Combustion gas outlet (B) through a prefab chimney, or through a double-walled
roof through feed Ø80 mm with traction extractor hood.
The prefab chimney must be fitted with flue tube openings of at least 150cm
2
per
connected unit and must meet the stated minimum measurements. The supplier
must guarantee the proper functioning of the prefab chimney in terms of wind
damage, ice forming, raining in etc.
Permitted pipe lengths at Ø80 mm.
Air supply and combustion gas outlet pipe including length of the feedthrough.
RKOMB22AAV1
100 m
RKOMB28AAV1
85 m
RKOMB33AAV1
80 m
Combustion gas outlet and air supply pipe
For assembly, see par. 5.6.5 General assembly.
Horizontal air supply assembly
The air supply (A) can be fitted at any place in the facade.
1.
At the location of the air supply, create a groove of Ø90 mm.
2.
Shorten the air supply pipe to the required length from the wall.
3.
Fit the inlet roster and attach it to the pipe.
4.
Slide the air supply pipe into the groove and cover the groove with a pipe cover
if necessary.
5.
Fit the air supply, at the place of the facade feedthrough, on a slope outward,
in order to prevent raining in.
Assembly of vertical combustion gas outlet
1.
Fit a feed-through panel with scale on a sloped roof surface at the location of
the outlet.
Fit a roof panel suitable for a double-walled combustion gas outlet Ø80 mm
(diameter Ø96 mm) in a flat roof.
2.
Slide the double-walled combustion gas outlet from outside to inside through
the roof through feed.
The outlet should end up at least 500 mm above the roof surface.
Содержание RKOMB22AAV1
Страница 1: ...ROTEX Heating Systems GmbH RKOMB22AAV1 RKOMB28AAV1 RKOMB33AAV1 Installation instructions English...
Страница 3: ......
Страница 57: ......
Страница 58: ......
Страница 59: ......
Страница 60: ...885537 4P374377 1A...