6 Installation
Installer reference guide
14
07C2V3
ROTEX HPSU monobloc compact outdoor unit
4P501827-1 – 2017.08
NOTICE
To prevent damage to the supporting feet, do NOT tilt the
unit sideways in any way:
6.3.5
To provide drainage
▪ Avoid installation places where water leaking from the unit due to
a blocked drain pan can cause damage to the location.
▪ Make sure that condensation water can be evacuated properly.
▪ Install the unit on a base to make sure that there is a proper
drainage in order to avoid ice accumulation.
▪ When the unit is in cooling mode, condensate may also form in
the hydro part. When providing drainage, therefore make sure to
cover the entire unit.
▪ Prepare a water drainage channel around the foundation to drain
waste water surrounding the unit.
▪ Avoid drain water flowing over the footpath, so that it does not
become slippery in case of ambient freezing temperatures.
▪ If you install the unit on a frame, install a waterproof plate within
150 mm of the bottom side of the unit in order to prevent the
invasion of water in the unit and to avoid the drain water dripping
(see the following illustration).
NOTICE
If the unit is installed in a cold climate, take adequate
measures so that the evacuated condensate cannot
freeze.
INFORMATION
For information on the available options, contact your
dealer.
NOTICE
Provide at least 300 mm of free space below the unit.
Additionally, make sure the unit is positioned at least
100 mm above the expected level of snow.
6.3.6
To prevent the outdoor unit from falling
over
In case the unit is installed in places where strong wind can tilt the
unit, take following measure:
1
Prepare 2 cables as indicated in the following illustration (field
supply).
2
Place the 2 cables over the outdoor unit.
3
Insert a rubber sheet between the cables and the outdoor unit
to prevent the cable from scratching the paint (field supply).
4
Attach the cable’s ends. Tighten those ends.
6.4
Connecting the water piping
6.4.1
About connecting the water piping
Before connecting the water piping
Make sure the outdoor unit is mounted. If applicable, also make sure
the control box and the backup heater are mounted.
Typical workflow
Connecting the water piping typically consists of the following
stages:
1
Connecting the water piping of the outdoor unit.
2
Connecting the water piping of the HPSU monobloc tank.
3
Filling the water circuit.
4
Protecting the water circuit against freezing (addition of glycol).
5
Filling the domestic hot water tank.
6
Insulating the water piping.
INFORMATION
For instructions regarding the HPSU monobloc tank, see
the installation manual of the tank.
6.4.2
Precautions when connecting the water
piping
INFORMATION
Also read the precautions and requirements in the
following chapters:
▪ General safety precautions
▪ Preparation
6.4.3
To connect the water piping
NOTICE
Do NOT use excessive force when connecting the piping.
Deformation of the piping can cause malfunctioning of the
unit. Make sure that the tightening torque does NOT
exceed 30 N•m.
To facilitate service and maintenance, 2 shut-off valves are provided.
Mount the valves on the space heating water inlet and space heating
water outlet. Mind their position: the integrated drain valves will only