 Safety

2.5

Instructions for operating safety

2.5.1 Before working on the heating system

Ɣ

Work on the heating system (such as installation, connection
and initial start-up) may only be carried out by authorised,
trained heating technicians.

Ɣ

Switch off the main switch and secure it against unintended
switching on when carrying out any work on the heating
system.

Ɣ

Seals must not be damaged or removed.

Ɣ

Make sure that the safety valves comply with the require-
ments of EN 12828 when connecting on the heating side, and 
with the requirements of EN 12897 when connecting on the
domestic water side.

2.5.2 Electrical installation

Ɣ

Electrical installations must only be conducted by electrical
engineers and in compliance with valid electrical guidelines
as well as the specifications of the energy supply company.

Ɣ

Before completing the mains connection, compare the mains
voltage, indicated on the type plate (230 V, 50 Hz) with the
supply voltage.

Ɣ

Before beginning work on live parts, disconnect them from the
power supply (switch off main switch, remove fuse) and
secure against unintentional restart.

Ɣ

Equipment covers and service panels must be replaced as
soon as the work is completed.

2.5.3 Installation room

Ɣ

Operate ROTEX GCU compact only if sufficient combustion
air supply is ensured. If you operate the ROTEX GCU
compact in a room-air independent manner with a concentric
air/flue gas system (LAS) dimensioned as per ROTEX
standard, this is fulfilled automatically and there are no other
conditions for the equipment erection room. With installation
in residential rooms, this method of operation applies exclu-
sively.

Ɣ

Make sure that, with installation in a room-air dependent or
limited room-air independent manner, an inlet air opening to
the outside of at least 150 cm

2

 is provided.

Ɣ

Do not operate the ROTEX GCU compact by the ambient air
dependent method in rooms with aggressive vapours (e.g.
hair spray, perchloroethylene, carbon tetrachloride), strong
dust formation (e.g. workshop) or high humidity (e.g. laundry). 

Ɣ

Strictly keep the minimum distances to walls and other
objects (see chapter 4.1).

2.5.4 Requirements for the heating water

Avoid damage caused by deposits and corrosion:

 Observe 

the relevant regulations of technology to prevent creation of cor-
rosion products and deposits.

Measures for desalination, softening or hardness stabilization are 
necessary, if the filling and top-up water have a high total 
hardness (>3 mmol/l - sum of the calcium and magnesium con-
centrations, calculated as calcium carbonate.

Using filling water and top-up water which does not meet the 
stated quality requirements can cause a considerably reduced 
service life of the equipment. The responsibility for this is entirely 
that of the operator.

2.5.5 Heating system and sanitary connection

Ɣ

Create a heating system according to the safety requirements 
of EN 12828.

Ɣ

With sanitary connection, you must observe;

EN 1717 - Protection of potable water from contamination 
in domestic water installations and general requirements
concerning safety equipment for the prevention of domes-
tic water contamination by back-flow

EN 806 - Technical regulations for domestic water instal-
lations (TRWI)

and, in addition, the country-specific legal regulations.

During operation of the ROTEX GCU compact with hot water 
storage, the storage tank temperature may exceed 60 °C, partic-
ularly when solar power is used.

Ɣ

Therefore, incorporate scald protection during the installation 
of the system (domestic hot water mixing construcion, e.g. 
VTA32,

15 60 16

).

2.5.6 Fuel

The ROTEX GCU compact is factory set to the gas type indicated 
on the burner sticker and on the settings type plate and adjusted 
to the gas pressure indicated on the burner sticker.

Ɣ

Operate the unit only with the gas type and gas pressure
indicated on these stickers.

Ɣ

Installation and adaptation of the gas system must only be
conducted by personnel qualified for this work and in
compliance with valid gas installation related guidelines as
well as the applicable regulations of the gas supply company.

2.5.7 Operation

Ɣ

Operate ROTEX GCU compact only with closed silencer
hoods.

Ɣ

Only operate the ROTEX GCU compact if all the require-
ments as per the checklist in chapter 5.2 are fulfilled.

2.5.8 Instructing the user/owner

Ɣ

Before you hand over the heating system, explain to the
owner how he/she can operate and check the heating
system.

Ɣ

Hand over the technical documentation (at least the operating
instruction manual and operating handbook) to the user and
advise him that these documents must be made available at
all times and be stored in the immediate vicinity of the unit.

Ɣ

Make a record of the handover by filling out and signing the
installation and instruction forms jointly with the user/owner.

Содержание GCU compact

Страница 1: ...maintenance instructions Gas Combi Unit compact Types GCU compact 315 GCU compact 324 GCU compact 515 GCU compact 524 GCU compact 533 GCU compact 315 Biv GCU compact 324 Biv GCU compact 515 Biv GCU c...

Страница 2: ...gas line 26 4 9 3 Installing removing the burner trim 26 4 9 4 Checking the gas pre installation 27 4 10 Optional connections 28 4 10 1 Mixer module RoCon M1 28 4 10 2 Room control RoCon U1 28 4 10 3...

Страница 3: ...1 4 Integrated heating circulation pump 3 way valve 58 12 2 Gas type connection pressures 59 12 3 Tightening torque 60 12 4 Flow rate and residual feed height 60 12 5 Temperature sensor 60 12 6 Electr...

Страница 4: ...antee 4 ROTEX GCU compact 1 Guarantee 1 1 Warranty conditions The legal guarantee conditions fundamentally apply Our war ranty conditions beyond that can be found online on your sales representative s...

Страница 5: ...s Combi Unit compact conforms to the state of the art and meets all recognised technical requirements However improper use may result in serious physical injuries or death as well as property damage I...

Страница 6: ...rosion products and deposits Measures for desalination softening or hardness stabilization are necessary if the filling and top up water have a high total hardness 3 mmol l sum of the calcium and mag...

Страница 7: ...ructure and components GCU compact 315 324 plan view for legend designations see tab 3 1 Fig 3 2 Structure and components GCU compact 315 324 front view for legend designations see tab 3 1 89 Fig 3 3...

Страница 8: ...U compact 515 524 533 plan view for legend designations see tab 3 1 Fig 3 5 Structure and components GCU compact 515 524 533 front view for legend designations see tab 3 1 Fig 3 6 Structure and compon...

Страница 9: ...the container Only the hot water zone about it is heated by the boiler The tank volume below it is heated only on using the solar energy On the GCU compact 315 315 BIV 324 324 BIV 533 533 BIV models...

Страница 10: ...in series preheating stage the solar proportion is optimised Safety management The entire safety management of the ROTEX GCU compact is entrusted to electronic control This effects a safety switch off...

Страница 11: ...devices may not operate properly and are dangerous for the health and safety of individuals The ROTEX GCU compact must be installed only by heating engineers authorised and trained by gas or energy su...

Страница 12: ...1 110 250 r2 380 540 s1 345 s2 350 4701 200 3201 s3 535 3651 2852 500 3301 2502 s4 370 2001 210 401 s5 750 6301 5002 s6 750 6301 5002 750 6301 sD 150 t 615 790 w 595 790 1 When installing the test ada...

Страница 13: ...w from behind A Front side B Rear side Gc GCU compact Fig 4 6 Connection dimensions GCU compact 5xx plan view ROTEX recommends the installation of gravity brakes 16 50 70 or syphoning lead the connect...

Страница 14: ...ration of 90 min in residential buildings with low headroom 30 min Observe country specific regulations for fire resistance periods e Ventilation opening 1x150 cm or 2x75 cm f Rear ventilation opening...

Страница 15: ...rated from the roof truss Set up version 4 The ROTEX GCU compact with the SET GCU1 and the LAS connection line SET H or SET K is connected to the exterior wall system SET G The combustible air supply...

Страница 16: ...ks are suitable for transporting it Scope of delivery ROTEX GCU compact preassembled Bag of accessories see fig 4 8 Outside temperature sensor RoCon OT1 for weather con trolled regulation Document pac...

Страница 17: ...nsport the ROTEX GCU compact to the erection site use the handles Install ROTEX GCU compact at the place of installation Recommended distances to the wall s1 s2 s3 s4 see tab 4 1 To the ceiling sD 150...

Страница 18: ...flue gas calculations may be needed If the horizontal connecting piece is extended the maximum permitted height of the flue gas pipe is reduced by exactly that length Flexible flue gas lines must not...

Страница 19: ...E H G20 B Natural gas LL L G25 C Liquid gas mET Flue gas mass flow P Burner load Fig 4 12 Flue gas mass flow in dependence of the burner load ROTEX GCU compact all types We recommend to use the assoc...

Страница 20: ...system kits Fig 4 15 Flue system kits If needed See tab 4 1 L Flue gas connection left R Flue gas connection right H Flue gas connection rear V 3 3 V V 5 3 PP 9 PP 9 PP 9 PP 9 PP 9 PP 9 PP 6 7 6 6 6 6...

Страница 21: ...of adequate dimensions and pre set for the heating system must be connected to the return line There should be no hydraulic blocking ele ments between the heat generator and the safety valve Locate t...

Страница 22: ...construction Avoid damages caused by deposits and corrosion Observe the relevant regulations of technology to prevent creation of corrosion products and deposits Measures for desalination softening or...

Страница 23: ...need to be connected to the boiler control panel 4 7 2 Establishing the electrical connection Check the supply voltage 230 V 50 Hz Switch the mains switch on the boiler control panel of the ROTEX GCU...

Страница 24: ...35 1 Ensure that the polarity is correct After completing all electrical connection tasks re establish the power supply to the automatic fuse concerned Fig 4 24 Connection diagram of the circuit board...

Страница 25: ...ldest side of the building North or North East Thereby exclude the proximity of external heat sources chimney air shafts and direct sunshine Place external temperature sensors in such a way that the c...

Страница 26: ...ension to the gas supply line 4 9 3 Installing removing the burner trim Undo the safety screws on the upper burner trim fig 4 31 item 1 Remove the upper burner trim Assembly is carried out in reverse...

Страница 27: ...ection inlet gas pressure fig 4 32 item 3 3 Check the inlet gas pressure If the gas inlet pressure lies below the permissible range tab 12 5 inform the responsible gas supply company For liquid gas Ch...

Страница 28: ...e tank Without installed solar system Remove the filling hose with backflush prevention 1 2 to the connection Solar inflow fig 4 34 item 20 Fill the storage tank of the GCU compact until water begins...

Страница 29: ...4 x Set up and installation ROTEX GCU compact 29 20 Solar inflow 23 Safety overflow Gc GCU compact Fig 4 34 Filling buffer storage tank without connected DrainBack solar system Gc 5xx Gc 3xx...

Страница 30: ...illing for the first time and before switching the GCU compact at the mains switch check that all electrical parts and joints are dry WARNING Contamination of drinking water endangers the health When...

Страница 31: ...switch off the mains plug on the boiler control panel GCU compact switches off Wait 20 seconds before switching the mains switch on again Wait for the start phase 5 Second automatic calibration and p...

Страница 32: ...nly carry out a calibration of the firing unit when the exhaust setting values are not adhered to or when a mechanical change was carried out e g by replacing the component with original ROTEX spare p...

Страница 33: ...rrectly positioned Yes 15 Mixer group mixer module and mixer circuit sensor optional connected correctly Yes 16 Room controller optional correctly connected to the PCB Yes 17 Is the gas connection ins...

Страница 34: ...found in the documentation of the ROTEX RoCon BF Reglator 1 Mains switch 2 Operating part RoCon B1 3 Clear text display 4 Rotary switch 5 Setting Info 6 Setting Operating Mode 7 Setting Set Temp Day...

Страница 35: ...an cause an electric shock on contact and cause life threatening burns and injuries Before beginning work on live parts disconnect them from the power supply switch of fuse main switch and secure agai...

Страница 36: ...V DHW fig 6 5 to fig 6 7 WARNING There is a danger of scalding from heating water The sensor s are directly connected to the pres surised heating water Before removing the sensor s close the ball cock...

Страница 37: ...hing panel PCB see chapter 4 7 2 2 Pull out the storage tank temperature sensor from the sensor immersion sleeve at the storage tank 3 Bend the pressing springs on the new sensor and push the new sens...

Страница 38: ...urner blower burner flange 13 4x fixing screws burner flange boiler body 14 4x fixing screws burner blower blower adapter 15 Seal burner blower blower adapter 16 Burner flange seal 17 Burner adapter 1...

Страница 39: ...fault shutdowns check the heating system e g flue system fuel supply 7 3 Burner setting Tab 7 2 Possible adjustment ranges If changes have been made to the power settings of the burner or if it has be...

Страница 40: ...in CO2 content in Set Set Natural gas E H G20 15 7 4 6 0 6 0 2 9 2 0 1 0 3 Natural gas LL L G25 9 0 0 1 0 3 Propane G31 10 7 0 3 0 5 Liquid gas setting Compare with the information on the yellow stick...

Страница 41: ...housing 5 Carry out commissioning as per chapter 5 1 3 In the event of starting problems see section 7 3 4 More detailed explanations and possible setting values for these parameters can be found in t...

Страница 42: ...ition An overview is displayed 2 Select the SCOT config level with the rotary switch An overview is displayed 3 Using the rotary switch select the parameter Corr qGas start and confirm Current value i...

Страница 43: ...see chapter 4 9 3 Remove the safety clamp fig 7 5 item 1 for the Venturi nozzle Disconnect the mains plug for the blower and the plug for the blower controller fig 7 5 item 2 3 Undo 4 fixing screws fi...

Страница 44: ...on to the stipulated tightening torque see chapter 12 3 Check the gas line for leakage Start the burner Check for function leakage at the burner flange and the settings see section 7 3 3 1 Safety clam...

Страница 45: ...rk 2 Hot water distribution network 3 Heating inflow 4 Heating return flow 5 Mixer circuit 6 Circulation 7 Check valve return valve 7a Non return valves 8 Solar circuit 3UV DHW 3 way distribution valv...

Страница 46: ...46 ROTEX GCU compact 8 x Hydraulic connection Fig 8 1 GCU compact 3xx with DrainBack solar for legend see tab 8 1 Fig 8 2 GCU compact 5xx with DrainBack solar for legend see tab 8 1...

Страница 47: ...of the condensate drain must be free from impurities If a solar system DrainBack system is connected and is in operation switch it off and empty the solar panels Unscrew the overflow hose Open the co...

Страница 48: ...e the burner must be adjusted according to chapter 7 3 Burner setting Fig 9 2 Check condensation water drain The condensate is a weak acid It is added to the de pressurised zone of the hot water stora...

Страница 49: ...splay No mains voltage Switch on the main switch for the boiler Turn on main switch of heating room Check switch on fuse house connection Check renew fuse boiler control panel Only use the same type o...

Страница 50: ...t as necessary No ignition Ignition electrodes short circuited Check the ignition electrodes adjust or replace as necessary Distance of ignition electrodes too large Check the ignition electrodes and...

Страница 51: ...ault manufacturer s parameters E159 EEPROM fault safety parameters E189 Regulation deviation during ionisation process too high as of 2nd fault burner grounded in correctly or faulty supply voltage fi...

Страница 52: ...cable E99 Internal fault to firing unit E4 Automatic firing unit Temporary fault unit is at tempting to restart 1x no flame formation at end of safety time no gas valves do not open no ignition spark...

Страница 53: ...e combustion controller E129 Pressure sensor Measured value outside measuring range sensor temperature sensor defective Check cable terminal and plug connec tions Replace the sensor temperature sensor...

Страница 54: ...n 10 5 1 Requirements and procedures are identical to those in chapter 4 11 4 or b by removing the valve drive of the 3 way valve fig 4 28 item 5 1 from the valve GCU compact 5xx BIV 3UV DHW fig 3 4 P...

Страница 55: ...he floor Allow heat exchanger to run idle according to siphon principle 11 2 Final shutdown and disposal For final shutdown of the ROTEX GCU compact decommissioned see section 11 1 disconnect it from...

Страница 56: ...10 min at TKW 10 C TSP 60 C TWW 40 C Litres 19 21 Hot water quantity without reheating up to 15 l min tapping rate T KW 10 C TWW 40 C TSP 60 C Litres 200 Domestic hot water quantity with reheating at...

Страница 57: ...TKW 10 C TSP 60 C TWW 40 C Litres 20 23 24 Hot water quantity without reheating up to 15 l min tapping rate T KW 10 C TWW 40 C TSP 60 C Litres 230 Domestic hot water quantity with reheating at rated o...

Страница 58: ...ermissible operating pressure PMS 12 bar 3 0 Max permissible operating temperature 13 C 85 Max boiler efficiency 110 Flue gas air infeed connection diameter mm DN 60 100 DN 80 125 with SET GCU1 15 50...

Страница 59: ...plate bottom Information regarding the positions see tab 12 1 to tab 12 6 Gas type Rated pressure in mbar Min inlet pressure in mbar Max inlet pressure in mbar Natural gas E H 20 17 25 Natural gas LL...

Страница 60: ...Thread 1 25 30 Tab 12 7 Tightening torque pR Remaining pumping height mH Flow heating network 1 Modulation range Fig 12 2 Residual feed height GCU compact heater side mH Flow heating network Q Heatin...

Страница 61: ...n circuit board connector not occu pied J10 3 pin circuit board connector with mains ca ble for automatic firing CM434 J11 5 pin circuit board connector with mains ca ble for automatic firing CM434 J1...

Страница 62: ...62 ROTEX GCU compact 13 x Notes 13 Notes...

Страница 63: ...ow temperature sensor 9 FlowSensor 9 35 Flue gas mass flow 19 Flue system Dimensioning 18 Kits 20 Minimum requirements 18 Piping height 18 Flue system kits 20 G Gas connection Execution 26 Gas inlet p...

Страница 64: ...regulated at maximum load Select the load type Base Load using the rotary switch but do not confirm it Display Base Load The modulating gas burner runs at minimum output for 30 mins Cancellation and j...

Отзывы: