scale:
title:
drawing-no.:
ISO-Projektion Methode 1
series:
assembly instr.:
panel piercing:
crimp
insert:
cable:
PD_FB_01
general
tolerance
1
2
3
4
A
B
C
D
E
F
A
B
C
D
E
F
1
2
3
4
-METRIC-
AaBbCcDdEeFfGgHhIiJjKkLlMmNnOoPpQqRrSsTtUuVvWwXxYyZzÄäÖöÜüß1234567890
vertraulich /
confidential
©
ROSENBERGER HOCHFREQUENZTECHNIK GMBH & Co. KG or THIRD PARTY
The reproduction, distribution and utilization of this document as well as the communication
of its contents to others without express authorization by the owner or rights-holder is prohibited.
Offenders can be held liable. All rights reserved in the event of the grant of patent, utility model or design.
---
ISO 2768
---
mH
---
---
---
---
---
---
Bedienungsanleitung
Assembly Instruction
.
.
MA_AMW001-SET
sheet:
15
of:
16
remarks:
.
rev. change-no
name
date
100 18-v144
C_Ostermaier
24.01.2020
200 21-1614
K_Unterwiese
01.09.2021
appr.
08.09.2021 E_Preintner
check.
01.09.2021 M_Hellwig
drawn
16.09.2019 C_Ostermaier
date
name
(3.4.3) Das Werkzeug ist geöffnet. Außenleiter mit Crimpöffnung nach oben in
Positionierer einlegen.
The tool is open. Insert outer contact opening upwards in locator.
(3.4.4) Leitung mit gecrimptem Innenkontakt so weit in den Kuppler einschieben, bis Pin auf
der Rückseite des Positionierers sichtbar heraustritt.
Insert wire with crimped inner contact as far into the outer contact until the pin comes
out on the backside of the locator.
Pin sichtbar
Pin visible
Pin eingefahren
retracted pin
Außenleiter
outer contact
VORSERIE
PRE-SERIES