ROC LL1GBQ24-B26CG Скачать руководство пользователя страница 29

     Attention:

If the equipment needs to add water frequently after a long 

period  working,  this  indicates  the  heating  system  has  water  leakage  point. 

Please check the system and seal the leakage point to avoid the effect to the use 

life because of add water frequently. 

29

When you notice that the pressure is below 1.0-1.2 bar on the pressure gauge , you 

have to add water to the equipment.

When  the  equipment  begin  to  work,  maybe  there  are  some  air  storage  in  the 

system. And the air of system will be exhausted while the equipment keep running, 

in this case, the pressure will go down, so we have to add water to gas boiler in a 

short time. This is a normal phenomenon. 

The gas boiler must be installed by an installer/engineer according to the current 

laws  and  regulations.  Property  loses  and  person  harm  may  occur  because  of 

incorrect installation. Th

e manufacturer will not take any responsibility for that.

Before installation, ensure all newly installed gas piping is clean, so that the residue 

does not affect the operation o

f the boiler.

The qualified professional installer must make the following check before the first 

operatio

n;

a)Check the 

leak tightness of the gas pipe;

b)Adjust the gas pressure according to the requirement of gas boiler;

c)The gas type must match the gas requirement indicated in technical tag.

d)Gas supply pressure must match the requirement indicated in technical tag.

e)Gas supply must match the requirement of gas boiler and it must be equipped 

with safety and test device requested by the laws and regulations.

The gas pipe cannot be used as the ground connection of electrics.

Please turn off the gas valve when not using the appliance.

Please turn off thegas main valve when the user does not at home for long time, you 

should also drain out the water from heating and hot water system to avoid water 

freezing in the system.

When you smell the gas smell:

a) Don’t operate any electricity device;

b) Open the window immediately, ventilate the room thoroughly.

c) Turn off gas valve

d) Contact the installer/engineer.

Содержание LL1GBQ24-B26CG

Страница 1: ...Suitable for Installer Adjustment Personnel Maintainer Condensing wall mounted gas boiler Manual for Use Installation and Maintenance PIN NO 0063CR7770...

Страница 2: ...stall the boiler 16 4 7 Pay attention to noise control during installation 16 4 8 Open the box 16 4 9 Minimum distance of installationandmaintenance 17 4 10 Dimension of ue mounting hole 18 4 11 Insta...

Страница 3: ...boiler will work more reliably and e ciently We recommend annual inspection so that this manual will keep the boiler maintenance records Your legitimate rights and interests will not be a ected To the...

Страница 4: ...loss and injury to persons animals and personal property the manufacturer will not take possibility for such To ensure e cient and safe operation it is recommend that the boiler is maintained annually...

Страница 5: ...lease turn it o then turn o the gas valve and do not attempt to repair it by yourself Please contact with a quali ed professional personnel instead Before performing any maintenance or repair work on...

Страница 6: ...ried out by the quali ed personnel in accordance with local gas safety installation and use The technicians who undertake adjustment and maintenance must be authorized by the manufacturer If the boile...

Страница 7: ...istauthorizedby ROCdistributor Partsreplacementmustbeusedoriginalspareparts Thisisanecessary conditionforboilerwarrantyandmaintenance Do not use or store any ammable or explosive materials such as gas...

Страница 8: ...set 8 Mode 1 2 3 4 5 6 7 8 Heatingtiming Fireclass Heating temperatureindication Heatingoperation stateselection Timeweek Operationstate Hotwater temperature Wintermode Malfunction Timing Anti freeze...

Страница 9: ...Threewayvalvemotor 9 Plateheatexchanger 10 Waterpressureswitch 11 Hotwatertemperaturesensor 12 Overheatprotector 13 Heatingtemperaturesensor 14 Expansiontank 15 Backwatertemperaturesensor 16 Safetyrel...

Страница 10: ...10 Unit mm 3 4 Overall dimension and outlet position map A Gas B Domestic hot water C Cold water D Heating back water inlet E Heating water outlet LL1GBQ24 B26CG...

Страница 11: ...y water maximum pressure Sanitary water minimum pressure Expansion tank capacity Expansion tank preset pressure Heating system maximum pressure NG normal pressure Performance Heating water maximum tem...

Страница 12: ...equire speci c ventilation If the boiler is installed in a cupboard or compartment ventilation is not required for cooling purposes The gas installation and tightness test must be in accordance with r...

Страница 13: ...scale can greatly a ect the e ciency of heat exchanger because small areas of scale can cause a high increase of the temperature in the metal parts and therefore increase the heat pressure of heat exc...

Страница 14: ...for most modern electronic time and temperature controls The adding of such external controls can be bene cial to the e cient operation of the system Installation position The boiler can be installed...

Страница 15: ...inverted pipe Spray gun is matched in the pipe ii A trap giving a water seal of at least 75mm must be incorporated into the pipe run there also must be an air beak upstream of trap iii Connect into th...

Страница 16: ...ccessories described in the following list are included in the boiler package Please comply with the relevant national or region standard or guidelines when installing the wall mounted gas boiler The...

Страница 17: ...e boiler such as decoration etc please also ensure that it is such minimum distance otherwise it may a ect the usage and maintenance of the boiler in the future We advise that the minimum distances fr...

Страница 18: ...and pass through the wall which is used for installing forced draught ue Use expansion bolts to x the product hang up plate on the walls Lift the boiler up so that the two square holes behind horizont...

Страница 19: ...st be installed in the place where the damage is impossible to occur In cold or humid weather water vapor can condense and leave on the ue terminal The e ect of such steaming must be considered If the...

Страница 20: ...ystem includes 1 Seal for horizontal ue duct and external wall 2 90 elbow 3 30mm ue clamp 4 48mm ue clamp 5 Internal trim ring 6 External wall seal 20 Flue system Standard ue installation Flue Clamp M...

Страница 21: ...t Ensure that the ue is not blocked Ensure that the ue is installed and xed in accordance with below these instructions Coaxial pipe room accessories 60 100 level 1 Silicon O ring 60mm 1 Elbow 90 2 In...

Страница 22: ...rtical axis of ue the elbow can rotate with 360 Before installing the ue ensure the maximum length of ue ducting does not exceed 5m see picture 5 6 and consider all of elbows and its bend You should r...

Страница 23: ...notlowthan20mbar Water way connection Beforeconnectingthecoldwaterpipe makesurethattherelativepipesystemhasbeen thoroughlywashed Ifnot please rstlythoroughlywashhotandcoldwaterpipeline Check that the...

Страница 24: ...nagebyusingpipe otherwise when the safety relief valve discharge water it may injury the passerby and articles The boiler manufacturer will not take any responsibility for this 7m frequency conversion...

Страница 25: ...les The above basic safety requirements must be checked If you have any questions please ask the installer engineer to check the boilers carefully The manufacturer will not take any responsibility for...

Страница 26: ...k can cause smoke to discharge into surrounding air in a short time At the same time before supplying heating domestic hot water to the users the boiler should be connected to a heating supplying netw...

Страница 27: ...ater outlet Fill water to heating system Access to the tap water and heating water adding connector then open the tap water adding connector and heating water adding connector valve in turn ll water t...

Страница 28: ...rrentregulations Ensureminimalmaintenancespacewhenfurniture walls or other obstructions surround the equipment Make sure that all heating and domestic hot water lines connected to the wall hung boiler...

Страница 29: ...g is clean so that the residue does not a ect the operation of the boiler The quali ed professional installer must make the following check before the rst operation a Check the leak tightness of the g...

Страница 30: ...setto45 C atanytimetoperformhotwaterwork thesesettingcanbemadedirectly 30 1 Timing 2 Functionswitch 3 Up 4 ON OFF Power 5 Informationindicationdisplay 6 Down 7 Reset 8 Mode 1 2 3 4 5 6 7 8 5 5 Start...

Страница 31: ...ode longpress Timing button formorethan5stomakeDayTiming setting from00to23 Firsttimingperiod ashes whenpressing Up button itwillallow the heating during this period and when pressing Down button it w...

Страница 32: ...function itwill ashindication otherwiseitwillbeno ashindication Anti freezingicon Whenthepumpisanti freezing itwillbestaticindication Whenit isheatingtheanti freezing itwill ashindication Itallowsanti...

Страница 33: ...meicon itindicatespresenttime Weekicon ItwillindicatewhenitisOFFandcarryoutWeekTiming mode presentdatewillbeorangeindication Timingperiodicon Whenthetimesettingfunctionisactivated itwill indicate Andi...

Страница 34: ...alysis or power adjustment CO2 in the gas and fan speed value shall comply with the following table Warning When the gas inlet pressure is not between 17 25 mbar then prohibit the following operation...

Страница 35: ...ence between the air inlet portand uegasoutletportofthe coaxial ue Pay attention to the installation condition in the windy case the ow back ue gascannotexceed50g min The condensing water in the ue ca...

Страница 36: ...ew owner or installer can read these information All accessories of wall hung boilers should be used all original components This equipment can only be used for the purpose speci ed in the instruction...

Страница 37: ...gas supply is smooth and water in the heating system is enough However when there is some external failure such as gas or power outage or air exhaust system are abnormal the inner monitoring device wi...

Страница 38: ...turns o four seconds The communication is interrupted or disturbed 0 5bar pressure 3 5bara or the water pressure switch is not acted Variable frequency pump has malfunction or electrical power 12W Th...

Страница 39: ...screws of bottomplate Remove the upper and lowereightscrewsonthe side plate and the two screws on the cover removethecover Lift the plastic panel frombottom Unscrew the 4 screws ofthe sealing cover Di...

Страница 40: ...40 3 Unscrew the 4 screwson thefrontofthesideplate Dismantlethesideplate Basic dismantling Tools...

Страница 41: ...rcuit component Take out the screws on bothsidesofelectricalbox Open the Electrical box as shown above Removethefuse Take out the electrical boxbackcoverupward Electrical box operation Fuse replacemen...

Страница 42: ...eElectrical boxasshownabove Dismantlethe3screwson thebackofdisplaycover Remove the cover ofdisplay Dismantlethe4 screws on the PCB RemovethePCB PCB replacement Display replacement time 6min Tools time...

Страница 43: ...43 2 Dismantlethe4screwson therearcoverofdisplay Takeouttherearcover Takeoutthedisplay Display replacement Tools...

Страница 44: ...44 7 3 Water system...

Страница 45: ...45 1 1 Take out the safety valveclip Takeouttheairexhaust valve manually Take out the safety valvemanually Safety valve dismantling Air exhaust valve dismantling time 5min Tools time 2min Tools...

Страница 46: ...e the 2 screws onplateheatexchanger by 5mm internal six anglescrewdriver Separate the bottom plateandwatersystem asshownabove Takeouttheplateheat exchangerdownward Plate heat exchanger dismantling tim...

Страница 47: ...gnitionneedleand ame detection needle as shown above then take out the ignition needle anddetectionneedlemanually Unscrewthetwoscrews onheatingtemperature sensor and take the temperaturesensorout Comb...

Страница 48: ...ethod to dismantle the combustion chambersealingcover Dismantle the 4 nuts connected with fan by 8mmspanner Dismantle the connection of the gas pipe by 24mm spanner takeoutthefanafter dismantlingthega...

Страница 49: ...cdismantling method remove the left sideplate Takeouttheclipofheating inletandoutletwaterpipe thenunscrewheatinginlet and outlet water pipe connectionnutsby30mm spanner takeheatinginlet andoutletwater...

Страница 50: ...2 50 Take out the condensate waterdrainagebellows Dismantlethe4screws which the heat exchanger connects with the bottom plate then take out the wholeheatexchanger Heat exchanger dismantling Tools...

Страница 51: ...ualinspection cleanifnecessary Water owvolumesensor Maintenanceinterval yearly Method visualinspection cleanif necessary checkthewater owvolume Expansiontank Maintenanceinterval yearly Method thepress...

Страница 52: ...ly Methods visualinspection cleanifnecessary Condensatewatercollector Maintenanceinterval yearly oraftercleaningthe mainheatexchanger Method visualinspection cleanifnecessary add waterbeforereplacemen...

Страница 53: ...sensor Hot water temperature sensor Back water temperature sensor Flue gas temperature sensor Outside temperature sensor Room temperature controller Power wire AC 230 V External circulation pump Three...

Страница 54: ...54 Memo...

Страница 55: ...55 Memo...

Страница 56: ...The user s manual can be translated to the o cial language of destination country not limited ony English version...

Отзывы: