he boiler should be installed on the vertical,
flat, and solid load-bearing walls. Check the
load-bearing capacity of all fastene
rs.
Determine
the position of installing the inlet /
exhaust balanced flue and mark it on the
wall.(see picture 5.3)
Tips:
the boiler shall not be installed on
the combustible wall surface.
Use the drill to make a hole with a
diameter of 120mm in Ф120 position and
pass through the wall, which is used for
installing forced draught flue.
Use expansion bolts to fix the product
hang up plate on the walls.
Lift the boiler up, so that the two square
holes behind horizontal hanging beam are
corresponding to the hooks on the wall. And
close to the wall , then put down the boiler
lightly to make this two square holes of
horizontal hanging beam to enter into the
hook. (see picture 5.4).
18
4.10
Dimension of flue mounting hole
Picture 5.4 Installation diagram
Picture 5.3 The mounting hole
Hole opening position
of flue which installs
the air
filter.
Hang-up
plate
Содержание LL1GBQ24-B26CG
Страница 40: ...40 3 Unscrew the 4 screwson thefrontofthesideplate Dismantlethesideplate Basic dismantling Tools...
Страница 44: ...44 7 3 Water system...
Страница 54: ...54 Memo...
Страница 55: ...55 Memo...