![ROC LL1GBQ24-B26CG Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/roc/ll1gbq24-b26cg/ll1gbq24-b26cg_manual-for-use-installation-and-maintenance_1471900014.webp)
To prevent this pr
oblem ,it is necessary to use the pipes with an “oxygen proof
barrier”. If pipes of this kind are not used, keep the system separate by installing
heating exchangers of those with a specific system water treatment.
Failure to carry out the water treatment procedure will invalidate the boiler
guarantee.
The boiler is electrically controlled and is suitable for most modern electronic time
and temperature controls. The adding of such external controls can be beneficial to
the efficient operation of the system.
The boiler can be installed on any suitable internal wall (sound proof is required
when installing onto a stud partition wall). Provision must be made to allow for the
correct routing of the flue and sighting of terminals to allow the safe and efficient
removal of the flue products. A compartment or cupboard used can be built or
modified for this purpose. It is not necessary to provide permanent ventilation for
cooling purposes.
14
Содержание LL1GBQ24-B26CG
Страница 40: ...40 3 Unscrew the 4 screwson thefrontofthesideplate Dismantlethesideplate Basic dismantling Tools...
Страница 44: ...44 7 3 Water system...
Страница 54: ...54 Memo...
Страница 55: ...55 Memo...