65
INFORMATION ON HANDLING AND INSTALLATION
ENG
4.6. MACHINE FIXING
Once the units have been assembled and levels, squaring, parallelism and orthogonality have been checked, it is
necessary to fix the machine body to the floor.
Depending on the floor type, it may be necessary, before laying the machine, to lay foundations in correspondence of
the various supporting legs.
Laying the foundations and fixing the machine is essential to ensuring the machine stability and functionality.
Important
Should it be necessary, insert metal pates (A) between the screws and the floor.
Rotoplat 308-508-708
Rotoplat LP 308-508-708
Rotoplat TP3 308-508-708
Содержание ROTOPLAT 108-308-508-708
Страница 2: ...ENG 2 Page left blank intentionally ...
Страница 22: ...ENG SAFETY INFORMATION 22 Rotoplat 308 508 708 Rotoplat TP3 308 508 708 Rotoplat LP 308 508 708 ...
Страница 29: ...29 TECHNICAL INFORMATION ENG Rotoplat 308 508 708 Rotoplat TP3 308 508 708 Rotoplat LP 308 508 708 ...
Страница 32: ...ENG TECHNICAL INFORMATION 32 Rotoplat 308 508 708 Rotoplat TP3 308 508 708 Rotoplat LP 308 508 708 ...
Страница 50: ...ENG INFORMATION ON HANDLING AND INSTALLATION 50 Package with cardboard box Package in cage ...
Страница 79: ...79 INFORMATION ABOUT THE USE ENG ...
Страница 80: ...ENG INFORMATION ABOUT THE USE 80 ...