
2 Introduction
Manual ERZ 2000-NG · EN07 · 2019, May 13th
76
FF07 Pre/post run
Parameter for a relative specification of the run-up and
after-run time, corresponding to the time between Time
stamp 1 and 2 or 3 and 4
FF08 Delay
Parameter for a wait time before the start with Time stamp 1
There are multiple processes for using the revision function.
Use of the time stamp with manual entry.
If the 4 time stamps are entered, activate the "Start Time1" button. Then the function
starts automatically when the times are reached and stops after the 4th time stamp
has elapsed. The test time, the time for run-up/after-run and the delay are calculated
and adopted from these times. There is also an option for activating an revision di-
rectly by clicking on the "Start now" button. For this purpose, the test time and run-
up/after-run must be specified beforehand.
Use of the time stamp with input via the DSfG from the revisioning PC.
If the 4 time stamps are entered, the function starts automatically after the times are
reached and stops after the expiration of the 4th time stamp. The test time, the run-
up/after-run and delay time have no effect.
Parameterization of the time stamp with entry by means of remote operation
via the browser.
For this purpose, click on the "
schedule
" button under the table. The 4 time stamps
are calculated from the PC time (not the flow computer time!) and the values for test
time, run-up/after-run and delay. The function starts automatically when the times are
reached and stops after the 4th time stamp has elapsed.
The prior function of the DSfG revision is merged with the official custody transfer
revision. The result of a completed revision can be viewed in the browser.
Note
The summary of the archive cannot be viewed with a representation in the
4 lines of the display and the values must be written down. In addition, the
representation of data elements of archive groups 11, 12 and 13 takes getting
used to.
Содержание ERZ2000-NG
Страница 10: ......
Страница 43: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 33 Figure 17 Display of the ERZ2000 NG in the browser...
Страница 68: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 58 Figure 44 Menu LA Overview...
Страница 69: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 59 Figure 45 Menu LB Totalizer BM1...
Страница 77: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 67 Figure 51 Overview System sub menu...
Страница 109: ...3 Electrical connections Manual ERZ 2000 NG EN07 2019 May 13th 99 Figure 81 Menu EH Module assembly...
Страница 111: ...3 Electrical connections Manual ERZ 2000 NG EN07 2019 May 13th 101 Figure 83 Menu EI Configuration...
Страница 241: ...6 Flow meters Manual ERZ 2000 NG EN07 2019 May 13th 231 Figure 167 Interface module C34...
Страница 261: ...6 Flow meters Manual ERZ 2000 NG EN07 2019 May 13th 251 6 5 2 AP diff pressure Figure 184 Menu AP differential pressure...
Страница 340: ...8 Overview Coordinates Manual ERZ 2000 NG EN07 2019 May 13th 330 8 5 6 TSV export...
Страница 345: ...9 Faults Manual ERZ 2000 NG EN07 2019 May 13th 335 9 1 2 JB Message register Figure 249 Menu JB Message register...
Страница 347: ...9 Faults Manual ERZ 2000 NG EN07 2019 May 13th 337 9 1 4 JD Debugging Figure 251 Menu JD Debugging...
Страница 448: ...Appendix Manual ERZ 2000 NG EN07 2019 May 13th 438 K 18 T Trend TA Trend block See chapter 2 5 8 Trend...
Страница 453: ...Certificates Manual ERZ 2000 NG EN07 2019 May 13th 443...