4 Communication and bus systems
Manual ERZ 2000-NG · EN07 · 2019, May 13th
144
Setting in
IB09 / IB12 / IB21
operating mode
Interface Task
DSfG control sta-
tion
IB09
COM 3
ERZ2000-NG is the
DSfG control station
DSFG
IB12
COM 4
ERZ2000-NG is the
"normal" participant
on the bus
ERZ2000-NG is the computing and/or registration instance
Modem
IB21
COM 5
ERZ2000-NG establishes a
DSfG station access
as a DFÜ unit
An external modem should be connected to COM 5
The DSFG bus is connected via COM 4 for a "normal" user.
DSfG pin assignment:
1
+U (+5V DC) activatable via DIP Switch
2
GND
activatable via DIP Switch
3
RDA/TDA
4
free
5
GND
activatable via DIP Switch
6
free
7
GND
activatable via DIP Switch
8
TDB/RDB
9
free
GND and +5V are the voltage supply of the RS 485 part, not the computer. The
housing of the trapezoidal plug must be connected electrically to the housing of the
device.
DSfG bus termination
The start and end of the DSfG bus must be terminated electrically. For this purpose,
there are two 8-pole DIP switches (
Figure
103
) on the DSfG interface board which
are provided to switch the bus terminating resistors and current supply to the plug.
The left switch on the board (see
Figure 103: DIL switches of COM 3 and COM 4
) is
for the computing and registration instance, the right switch for the control station (if
available). In
Figure 103
, the switches are "ON" in the "rear" status (towards the
printed circuit diagram) and "OFF" in the "front" status.
The interfaces are isolated galvanically and conform to DSfG specifications. In order
to fulfill the specifications for the bus supply and the idle level, the resistances and
voltage can be activated with DIL Switches. The terminating resistor is positioned
according to the specifications at the start or end of the main cable and, therefore,
positioned externally on the cable or preferably on the star distributor.
Содержание ERZ2000-NG
Страница 10: ......
Страница 43: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 33 Figure 17 Display of the ERZ2000 NG in the browser...
Страница 68: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 58 Figure 44 Menu LA Overview...
Страница 69: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 59 Figure 45 Menu LB Totalizer BM1...
Страница 77: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 67 Figure 51 Overview System sub menu...
Страница 109: ...3 Electrical connections Manual ERZ 2000 NG EN07 2019 May 13th 99 Figure 81 Menu EH Module assembly...
Страница 111: ...3 Electrical connections Manual ERZ 2000 NG EN07 2019 May 13th 101 Figure 83 Menu EI Configuration...
Страница 241: ...6 Flow meters Manual ERZ 2000 NG EN07 2019 May 13th 231 Figure 167 Interface module C34...
Страница 261: ...6 Flow meters Manual ERZ 2000 NG EN07 2019 May 13th 251 6 5 2 AP diff pressure Figure 184 Menu AP differential pressure...
Страница 340: ...8 Overview Coordinates Manual ERZ 2000 NG EN07 2019 May 13th 330 8 5 6 TSV export...
Страница 345: ...9 Faults Manual ERZ 2000 NG EN07 2019 May 13th 335 9 1 2 JB Message register Figure 249 Menu JB Message register...
Страница 347: ...9 Faults Manual ERZ 2000 NG EN07 2019 May 13th 337 9 1 4 JD Debugging Figure 251 Menu JD Debugging...
Страница 448: ...Appendix Manual ERZ 2000 NG EN07 2019 May 13th 438 K 18 T Trend TA Trend block See chapter 2 5 8 Trend...
Страница 453: ...Certificates Manual ERZ 2000 NG EN07 2019 May 13th 443...