1 About this manual
Manual ERZ 2000-NG · EN07 · 2019, May 13th
6
Note
The flow computer ERZ2000-NG is approved for officially certified operation.
For this purpose, it is sealed before deliver and settings specified by the ap-
proval authority are blocked.
These seals, software or hardware locks must not be damaged, destroyed or
removed!
In this case, the ERZ2000-NG loses its official certification!
The ERZ2000-NG can only be approved for officially certified operation after a
renewed inspection by calibration officials and an additional inspection of ad-
ditional settings in the factory.
The calibration official must re-apply the seals and blockades.
Observe the following, in particular:
x
Modifications of the flow computer ERZ2000-NG are not permitted.
x
The technical specifications must be observed and followed for safe operation
(
chapter 3 Electrical connections
). Performance limits must not be exceeded.
x
The flow computer ERZ2000-NG must only be used in the scope of the in-
tended use (
chapter1.5 Areas of application)
x
The flow computer ERZ2000-NG complies with current standards and regula-
tions. However, danger can arise with misuse.
1.2.4.2
Dangers during commissioning
Initial commissioning
The initial commissioning must only be carried out by
specially trained personnel (training by RMG) or RMG
service personnel.
Содержание ERZ2000-NG
Страница 10: ......
Страница 43: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 33 Figure 17 Display of the ERZ2000 NG in the browser...
Страница 68: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 58 Figure 44 Menu LA Overview...
Страница 69: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 59 Figure 45 Menu LB Totalizer BM1...
Страница 77: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 67 Figure 51 Overview System sub menu...
Страница 109: ...3 Electrical connections Manual ERZ 2000 NG EN07 2019 May 13th 99 Figure 81 Menu EH Module assembly...
Страница 111: ...3 Electrical connections Manual ERZ 2000 NG EN07 2019 May 13th 101 Figure 83 Menu EI Configuration...
Страница 241: ...6 Flow meters Manual ERZ 2000 NG EN07 2019 May 13th 231 Figure 167 Interface module C34...
Страница 261: ...6 Flow meters Manual ERZ 2000 NG EN07 2019 May 13th 251 6 5 2 AP diff pressure Figure 184 Menu AP differential pressure...
Страница 340: ...8 Overview Coordinates Manual ERZ 2000 NG EN07 2019 May 13th 330 8 5 6 TSV export...
Страница 345: ...9 Faults Manual ERZ 2000 NG EN07 2019 May 13th 335 9 1 2 JB Message register Figure 249 Menu JB Message register...
Страница 347: ...9 Faults Manual ERZ 2000 NG EN07 2019 May 13th 337 9 1 4 JD Debugging Figure 251 Menu JD Debugging...
Страница 448: ...Appendix Manual ERZ 2000 NG EN07 2019 May 13th 438 K 18 T Trend TA Trend block See chapter 2 5 8 Trend...
Страница 453: ...Certificates Manual ERZ 2000 NG EN07 2019 May 13th 443...