3 Electrical connections
Manual ERZ 2000-NG · EN07 · 2019, May 13th
127
Measurement value
Original encoder counter Vc
DZU (digital counter transmission) direction
Flow direction (when switching from forwards/backwards)
Transmission of analysis data (GC 1/2)
or Modbus data
If the billing mode is assigned to the original encoder counter Vo or a digital trans-
mission takes place (e.g. via Instance F), no sources must be assigned. If an illogical
case arises, a switch to the counters for undefined direction takes place automatical-
ly. All settings take place in menu
EC Billing mode
.
A setting can be made in coordinate
EC21 BM at revision
for whether the ERZ2000-
NG changes automatically in case of a revision of the billing mode (access only pos-
sible as super user). The operating code in coordinate
EC22 BM0 Suppression
can
define whether a changeover to the special counter set for undefined direction should
take place in case of an implausible contact assignment (see above).
The 4 special countera are assigned to frequency inputs 1 to 4 as an additional coun-
ter. A control counter can be activated here independently of the conversion. The
special counters
–
like the main counter for custody-transfer applications
–
have one
digit before and after the decimal (see
chapter 2.5.1.4 Counters
and
2.5.1.5 Custom-
er-specific counters (customer counters
)
). Like the "normal" counters, the special
counters can be assigned value and unit.
Note
These counters are permanently connected to the input and there is no differ-
entiation between main or disturbed quantities. Moreover, no characteristic
curve correction or leak flow volume suppression takes place.
Unit and value can be adjusted depending on the convertion. The portion after the
decimal is stored in a residual counter. The control counter is activated when the set-
ting of coordinate
NL10 Weighting
is greater than 0 (see
chapter 3.1.13 NL Fre-
quency input
1
).
Содержание ERZ2000-NG
Страница 10: ......
Страница 43: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 33 Figure 17 Display of the ERZ2000 NG in the browser...
Страница 68: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 58 Figure 44 Menu LA Overview...
Страница 69: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 59 Figure 45 Menu LB Totalizer BM1...
Страница 77: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 67 Figure 51 Overview System sub menu...
Страница 109: ...3 Electrical connections Manual ERZ 2000 NG EN07 2019 May 13th 99 Figure 81 Menu EH Module assembly...
Страница 111: ...3 Electrical connections Manual ERZ 2000 NG EN07 2019 May 13th 101 Figure 83 Menu EI Configuration...
Страница 241: ...6 Flow meters Manual ERZ 2000 NG EN07 2019 May 13th 231 Figure 167 Interface module C34...
Страница 261: ...6 Flow meters Manual ERZ 2000 NG EN07 2019 May 13th 251 6 5 2 AP diff pressure Figure 184 Menu AP differential pressure...
Страница 340: ...8 Overview Coordinates Manual ERZ 2000 NG EN07 2019 May 13th 330 8 5 6 TSV export...
Страница 345: ...9 Faults Manual ERZ 2000 NG EN07 2019 May 13th 335 9 1 2 JB Message register Figure 249 Menu JB Message register...
Страница 347: ...9 Faults Manual ERZ 2000 NG EN07 2019 May 13th 337 9 1 4 JD Debugging Figure 251 Menu JD Debugging...
Страница 448: ...Appendix Manual ERZ 2000 NG EN07 2019 May 13th 438 K 18 T Trend TA Trend block See chapter 2 5 8 Trend...
Страница 453: ...Certificates Manual ERZ 2000 NG EN07 2019 May 13th 443...