Contents
39
D
e
u
ts
ch
E
n
g
li
sh
Fr
a
n
ça
is
E
sp
a
ñ
o
l
It
a
li
a
n
o
7. Working life
7.1 Lifting column deliverables ....................................................................................... 52
7.2 Transport and storage ............................................................................................... 52
7.3 Important notes on installation and commissioning ............................................... 53
7.3.1 Synchronous operation of lifting columns................................................... 54
7.3.2 Different heights ........................................................................................... 54
7.3.3 Parallel alignment ......................................................................................... 54
7.3.4 Bends in the table frames ............................................................................. 54
7.3.5 The ideal configuration................................................................................. 55
7.3.6 Load distribution ........................................................................................... 56
7.4 Installation.................................................................................................................. 56
7.5 Connecting the hand switch ..................................................................................... 57
7.6 Functional description of the hand switch ............................................................... 57
7.6.1 6-key or 8-key hand switch ........................................................................... 57
7.7 Using the hand switch ............................................................................................... 58
7.7.1 Overview of the 6-key hand switch.............................................................. 58
7.7.2 Drive up to position manually ...................................................................... 58
7.8 Storing and driving up to positions .......................................................................... 59
7.8.1 Storing positions............................................................................................ 59
7.8.2 Determining users ......................................................................................... 59
7.8.3 Place position on a hot key........................................................................... 60
7.8.4 Drive up to stored position........................................................................... 60
7.9 Commissioning the lifting column............................................................................ 61
7.9.1 Commissioning a single lifting column ........................................................ 61
7.9.2 Commissioning a number of lifting columns............................................... 62
7.10 Connecting lifting columns ..................................................................................... 63
7.10.1 Lifting column connection principle .......................................................... 63
7.11 Setting up lifting columns: Master/Slave................................................................ 64
7.11.1 Set up first lifting column (Master) ............................................................ 64
7.11.2 Set up second lifting column (Slave 1) ....................................................... 64
7.11.3 Set up third lifting column (Slave 2)........................................................... 64
7.12 Initialisation run....................................................................................................... 65
7.12.1 When must you perform an initialisation run? ......................................... 65
7.12.2 Performing an initialisation run ................................................................. 65
7.13 Install settings (configuration) ................................................................................ 66
7.13.1 Basic configuration procedure.................................................................... 66
7.14 Settings table (configuration) ................................................................................. 67
7.15 Lift setting ................................................................................................................ 68
7.15.1 Lift setting for RKPowerlift rack................................................................. 68
7.15.2 Lift setting for RKPowerlift spindle............................................................ 69
7.16 Servicing ................................................................................................................... 70
7.16.1 Lifting column servicing.............................................................................. 70
7.16.2 Servicing hand switches .............................................................................. 70
7.17 Cleaning.................................................................................................................... 70
7.18 Exchanging the primary fuse .................................................................................. 71
7.19 Error messages and fault clearance ........................................................................ 72
7.20 Disposal and returns ................................................................................................ 73
Содержание RKPowerlift Memory Synchro
Страница 182: ...7 Cicli di durata 182...