7. Working life
34
7.3.2 Connection of the hand switch
Procedure:
•
Push the hand switch plug
2
into socket
2
.
•
Push the plug
3
on the lead into socket
3
. See above picture.
The PLC/PC data interface and the hand switch are ready for operations.
7.3.3 Connection to a PC
Before connecting the PLC/PC data interface, you must first install the software supplied on the
PC. Prerequisite: the operating system Windows 95,98, NT or XP and .net Framework 1.1 from
Microsoft must be installed.
Proceed as follows:
•
Place the CD supplied in the CD-ROM drive of your PC.
•
Call up the installation file
Setup.exe
on the CD.
•
Follow the instructions in the installation menu.
After completing the installation, carry out the following
steps:
•
Switch your PC off.
•
Plug the PC lead with the Western plug into socket
1
and the other end into a free, serial COM interface
on your PC.
•
Make the connection between socket
3
, the PLC/PC
data interface and hand switch socket on the lifting
column.
•
Switch on the PC and call up the PLC/PC data inter-
face program.
The PLC/PC data interface and the PC are now ready for operations.
There must not be any connection between the lifting column and the data interface
prior to connecting the hand switch!
The lead
1
must be pulled out.
3
1
Risk of damage!
It is essential that the PC is switched off before connecting the PLC/PC data interface!