This chapter describes how to install or mount the gateway. It includes these topics:
•
“Site preparations or considerations” on page 13
•
“Required tools and equipment” on page 14
•
“Rack mounting the SteelConnect SDI-2030 and SDI-5030 gateways” on page 14
•
“Powering on the gateway” on page 21
•
“Connecting to the network” on page 22
Site preparations or considerations
Before you install the SteelConnect SDI-2030 and SDI-5030 gateways, make sure that your site meets
the requirements suggested in this section.
•
“Site requirements” on page 13
•
“Safety information” on page 13
•
“Environmental considerations” on page 14
Site requirements
•
A standard electronic environment where the ambient temperature doesn’t exceed 95
°
F (35
°
C) and
the relative humidity doesn’t exceed 90% (noncondensing).
•
Ethernet connections are available within the standard Ethernet limit.
•
A clean power source is available, dedicated to computer appliances and other electronic
equipment.
•
The rack is a standard 19-inch Telco-type mounting rack.
Safety information
•
Carefully inspect the work area in which the gateway will be located to ensure against hazards such
as damp floors, ungrounded power extension cords, and missing ground connections.
•
Before you connect the gateway to power, locate the power off switch on the gateway and locate
the main circuit breaker for the room in which the gateway is installed. If an electrical accident
occurs, turn power off immediately.