4
Pub. No. 1200 — November 2005
RITE-HITE STR-4000 DOK-LOK Installation Manual
SAFETY DEVICES
• Post warnings and barricades at dock level
and at drive level to indicate that work is
being done around and under the leveler
platform.
• Lockout/Tagout power to the leveler and post
warnings when work is being performed on
the leveler.
Never be under the dock leveler platform or lip
without:
• Install the Safe-T-Strut
tm
or other manufacturer
approved supporting device. See figure 2.
• If you are unable to install the Maintenance
Support properly, contact your authorized
RITE-HITE
®
Service Representative or RITE-
HITE
®
Customer Service at 1-414-355-2600.
Figure 2 - Install Safe-T-Strut
TM
Support
Power Moving Components
Serious Injury Could Occur
HANDS
OFF
NO
STEP