16 -
FORCE
GB
Assembly instructions - FORCE 825/I
11 - The cable must be recovered while the bollard comes near the foun-
dation case (ref A).
Important: In this phase the connector must be free to slide inside of the
corrugated sheath. For this reason is it necessary for the segment be-
tween the bollard and the junction box to be connected by a sheath with
a diameter of 50 mm, correctly placed, without joints or cross section re-
ductions.
The cable must be gradually released while the bollard descends in the
case, (Ref. B)
Once the insertion has been completed, the connector must be in
proximity of the metal protection (ref C).
Pay attention to the electrical cable, it must be free inside the case housing
and it must not be crushed.
See figures alongside.
S
A
B
A
A
B
B
C
12 - Use four eyebolts with M8 studs to lift the bollard.
See figures alongside.