FORCE
- 15
GB
Assembly instructions - FORCE 825/I
8 - Prima di inserire il dissuasore nella sua sede, rimuovere la chiusura pre-
cedentemente disposta o il coperchio avendo cura di pulire attentamente la
sede di ancoraggio del dissuasore rapprentata dalla zona in grigio.
Vedi figure a lato.
7 - Dopo aver posizionato la cassa,
assicurarsi di coprire il vano aperto
,
per tutto il tempo in cui il dissuasore non è inserito,
con adeguata chiu-
sura atta ad impedire incidenti che possano coinvolgere persone o
cose
. Un coperchio in lamiera è disponibile come opzione.
Vedi figure a lato.
9 -Plan for a junction box in proximity (max 2/3m) of the bollard (Ref. S),
where about 1m of extra cable should be left. While inserting the bollard,
thanks to this junction box it will be possible to recover/release the cable
When installing multiple bollards, plan on a junction box for each bollard.
When laying the conduit, try to keep the path as straight as possible,
avoiding sharp corners.
See figures alongside.
S
S
S
10 -
Attention: The bollard is equipped with a short segment of con-
nection cable equipped with a male IP68 connector.
Different size extension cords are available (5 to 25 m), , equipped
with a female IP68 connector, for connecting to the control unit.
Bring the two parts of the connector together, aligning the arrow with the
circle as shown, then fully screw down the fixing nut.
IMPORTANT: You must close the connector fully and in the correct
manner to avoid bending the electrical contacts and to ensure a wa-
terproof seal. Check the connector and the illustrations carefully be-
fore proceeding. Do not force the two parts of the connector for any
reason.
The connector, when correctly put together, guarantees IP68 protec-
tion. The manufacturer cannot guarantee against faults and malfunc-
tions in the event of incorrect connection of the connector.
You are advised to check movement of the connector in the sheathing by
simulating the movement of the cable in the bollard, using specific prod-
ucts if necessary.