FORCE
- 13
1 - Place the 4 side elements vertically as in the image alongside.
2 - Using the round head screws provided, assemble the hexagonal structure.
It is very important to assemble the 4 elements vertically and on a surface
that ensures excellent flatness so as to obtain a reliable support surface
for the closing flange.
Attention: The screw head must be placed on the
internal side of the foundation case.
See figure alongside.
3 - Before fixing the upper flange, insert the metallic protection of the 50
mm diameter corrugated pipe which must be set in the ground to make
the subsequent electrical connection with the control unit. See figures
alongside.
GB
Assembly instructions - FORCE 825/I