15
Temp.Cut-Off
ON
80C
NiMH Sensitivity
D.Peak Default
Waste time
CHG/DCHG 5min
Lithium battery
CHK Time 10 min
Program select user settings
The battery becomes warm after cycles of a charge/discharge process.
The program will insert a time delay after each charge/discharge process to allow the battery
enough time to cool down before beginning next cycle of charge/discharge process.
The valid value ranges from 1 to 60 minutes.
This setting is for NiMH/NiCd batteries only. This screen allows you to set the delta peak detect
settings between 5mV and 25mV per cell. The default is set at 10mV, suiting most applications.
The screen shows the cut-off temperature of a battery. To set this you can press the or
button to turn this setting ON or OFF. Then use the same buttons to set the cut-off temperature
between 0~90
℃
. The maximum temperature of the battery can be set during the charge
process. The process will be terminated automatically to protect battery once the temperature
of battery reaches this value. This feature is accomplished through temperature probe (optional).
To avoid an erroneous setting by the user, the charger will automatically detect the cell count
of a Lithium battery at the beginning of the charge or discharge process. To prevent an
over discharged battery from being detected incorrectly, resulting in an error, you can set a
time limit for the processor to verify the cell count. The default setting is 10 minutes which is
typically enough time to properly detect the cell count. For batteries of a larger capacity, you
may extend the time, and for the batteries of a smaller capacity, you may reduce the time or
use with the default value.
Содержание Sigma EQ ECO II
Страница 1: ......
Страница 35: ...Notes...