PAGE 16
4-Point Loss Adjustment Positions
Fig 8.11
Loss Position 1
Loss Position 2
Loss Position 3
Loss Position 4
NOTE
A vertical green line is used to show which point of the LSA Measurement Areas is in focus when using the left and right
buttons. To move to the next point, tap the cursor select button to move to the next area.
4-Point / LSA Examples
Fig 8.12
LSA SET TOO EARLY:
The LSA area and cursor are set too early.
The right green LSA Indicator Line does not
overlay the backscatter of the Trace properly.
Fig 8.13
LSA SET TOO LATE:
The LSA Area and Cursor are set too late. The
left green LSA Indicator Line does not overlay
the backscatter of the Trace properly.
Fig 8.14
LSA SET PROPERLY:
The LSA Area and Cursor are set properly.
The green LSA Indicator Line overlays the
backscatter of the Trace properly.
Chapter 9: Project Management
9.1 Project Management Description
Project Management allows the user to save a set of parameters for future tests. It also incorporates the file management system
to save traces to the active project folder. When the OTDR is turned on, the default project is [Default]. If an existing project is not
open or a new one is not set, all traces will be saved to the [Default] folder.
NOTE
It is necessary to create the project before saving a trace as the file will not be available to save after going through the
project creation sequence.
Project Management Screen
Fig 9.1
ODM
Factory
RIPLEY
[DEFAULT]
Projects
Edit
New
Back
ODM OTDR
CUSTOM
TEST
VFL : OFF
VIEW TRACE
AUTO
TEST
OTDR Project
Folder List
Selected Project
Navigation Arrows
Delete Selected
Project
Return to Home
Screen
Rename Selected Project
Create New Project