
26
Preparations
Setting the date and time
The unit incorporates a clock which allows recording the date and time along
with measurement data.
Set the date and time as described below.
1. Press the MENU/ENTER key to bring up the menu list screen.
2. Use the
keys to select [System] and press the MENU/
ENTER key. The system screen appears.
3. Use the
keys to select [Clock Setting] and press the MENU/
ENTER key. The clock setting screen appears.
4. Use the
keys to select [Year], [Month], [Day], [Hour], [Minute]
and [Second].
5. Use the
keys to change the setting of the selected item.
6. Repeat the steps 4 and 5. Press the MENU/ENTER key to complete
the setting change. The clock starts moving with the new setting.
7. Press the START/STOP key to return to the measurement screen.
Important
If the unit is not to be used for an extended
period, the main batteries should be taken out
to prevent possible damage due to battery fl uid
leakage. After reinserting the batteries, be sure
to set the date and time.
Note
The clock in this unit has an error of about 1 minute
per month. Before measurement, be sure to check
and set the time if required.
An internal rechargeable backup battery serves to
keep clock setting on the unit. The backup battery is
automatically charged by the main batteries, but the
retention period for clock setting depends on charging
time (see page 15). Full charge of the backup battery
requires approximate 24 hours.
Содержание VM-56
Страница 2: ......
Страница 39: ...27 Preparations System screen Clock settings screen...
Страница 41: ...29 Preparations System screen Backlight LCD settings screen...
Страница 43: ...31 Preparations System screen Execution confirmation screen...
Страница 54: ...42 Reading the Display 1 channel display 3 channel display...
Страница 100: ...88 Serial Interface Follow the wizard to complete the installation Screens during installation are as follows...
Страница 101: ...89 Serial Interface Depending on your environment Windows Security may be dis played Click on Install or Continue...
Страница 175: ...163 Specifications 175 Front panel 175 9 2 40 3 5 1 2 Right side panel Top panel Unit mm Dimensional Drawing of VM 56...
Страница 178: ...166 Specifications Unit mm Dimensional Drawing of L bracket plate VP 54L 6 5 11 65 4 M4 countersunk holes 70 20 t 2 9 80...
Страница 179: ......
Страница 180: ...No 62991 18 08 This product is environment friendly It does not include toxic chemicals on our policy...