RIB2312 Sapphire Gas Log Flame Fire
- 15 -
1/03/18 ©Rinnai
CAUTION
240 Volt exposure. Isolate the electrical supply to the appliance and reconfirm with the
neon screwdriver or multimeter. Disconnect gas supply.
All work should be carried out by qualified service technician
1)
Remove of Front Panel
a. Remove 2 screws from bottom LH & RH.
(Refer Image 2).
b. Lift Front Panel assembly UP and forward.
c. Disconnect Control Panel Cable from the RJ45
connector located top left. (Refer Image 3).
d. Carefully place down.
Image 1
Image 2
2)
Removal of push button control panel
PCB
a. Remove the 2 retaining screws as marked in
Image 3.
Image 3
3)
Removal of push button control panel
label
a. Carefully remove old label taking care not to
damage duco.
b. Clean old adhesive residue from duco.
c. Remove wax paper from new label.
d. Line up opaque window with led and press to
panel.
Image 4