background image

Issue 3

Royale - Freestanding ETR

- 18 -

Issue 3 - ©Rinnai

1. To check burner pressure

• Turn OFF and disconnect the 240V power 

supply connection.

• Turn ON Gas supply. 

• Refer to Data Plate or the Technical 

Specification section in this manual for 
burner pressures.

• Open right hand side front cover panel 

(Remove 1-screw located under the front 
of the panel).

• Remove 240V electrical cover.

• Remove test point screw and attach 

manometer to test point, the test point is 
on the lower right hand side of the valve 
assembly.

• Connect the 240V power supply. 

Caution 

with the electrical panel open 240V 
terminals will be exposed. 

• Light heater, turn to High heat setting, wait 

8 minutes and check pressure. 

• If adjustments are necessary, the 

regulator is situated on the lower right 
hand corner and should be set to the 
pressures on the data-plate.

• Disconnect the 240V power supply. 

• Remove manometer and replace test 

point screw, check for gas escapes at test 
point screw.

• Replace electrical cover and secure side 

panel.

• Reconnect the power supply.

• Turn the heater on and off a few times to 

check ignition.

• All burner aerations are factory preset and 

cannot be adjusted.

• If you are unable to get the unit to operate 

correctly, refer to Trouble Shooting on 
Page 9  before contacting your local 
service contacts listed on the back page 
of this booklet.

• It may take approximately 2 hours of 

operation for the logs to achieve their full 
flame pattern and glow.

It is the responsibility of the installer to

check that under normal operating

conditions of the appliance, all flue gases

are exhausted to the outside atmosphere

and that there is no spillage of

combustion gases into the room. Refer to

AS/NZS 5601. 

2. Commissioning

Installation and Commissioning 

Checklist

Complete the Installation Checklist and the
Installer details on page 20 and make sure
that this instruction book is left with the
customer. 

Instruct Customer 

Make sure the customer understands the
instructions and the operation of the
appliance.

Advise that :

• The guard on this appliance conforms

to A.G.A. requirements. It is designed
to prevent the risk of injury from burns
and no part of it should be permanently
removed. IT DOES NOT GIVE FULL
PROTECTION TO YOUNG CHILDREN
OR THE INFIRM.

• For protection of young children or the

infirm, a secondary guard is
recommended.

• This appliance is designed to operate

with luminous flames and may exhibit
slight carbon deposits.

• During the initial burning in period,

(approx. 2 hours) some smoke and
smell may be experienced during this
period, the heater should be run on the
High position in a well ventilated room.

INSTALLERS INFORMATION - TESTING & COMMISSIONING

Содержание Royale FS35 ETR

Страница 1: ...on code AS NZS 5601 Gas Installations Any other local relevant Statutory Regulation Installation Service must be performed by an authorised person This heater is NOT designed to be inbuilt This heater...

Страница 2: ...ER INFORMATION SETTING THE CLOCK 4 OPERATING THE TIMERS 5 CUSTOMER INFORMATION SAFETY POINTS 6 CUSTOMER INFORMATION TROUBLE SHOOTING 10 CUSTOMER INFORMATION ERROR CODES 11 INSTALLER INFORMATION IMPORT...

Страница 3: ...g ON OFF TIME TEMP Display Shows either the time of day temperatures or coded error messages CLOCK ADJUSTMENT AND TIMER INDICATORS Indicates that clock or dual timer programme is being set OVERRIDE Te...

Страница 4: ...ental operation as well as small children from altering the controls To operate the lock simply press the LOCK button The function is activated immediately and the LOCK indicator will glow To Deactiva...

Страница 5: ...works within 5 metres and at an angle of 40 to the receiver which is located on the lower front edge of the heater Only use the battery type specified CR2032 Remove the battery if control is not going...

Страница 6: ...mming the ON OFF Timers Before programming the Timers you must ensure that the clock has been set to the correct time As an example let s program Timer 1 to heat the room by 7 10 am and finish at 9 00...

Страница 7: ...Forget Operation Your heater can be operated to alternate between Timers automatically during cold weather by selecting Timer 1 and Timer 2 together Both Timer indicators will glow The appliance will...

Страница 8: ...es must be maintained Do not restrict the warm air discharge by placing articles in front of the heater Do not spray aerosols whilst the heater is operating Most aerosols contain butane gas which can...

Страница 9: ...ble materials to come into contact with the heater This appliance must not be used for any purpose other than heating Do not allow anyone to post articles through the louvres Do not allow young childr...

Страница 10: ...o not allow anyone to sit on or lean against the appliance Do not unplug the heater while it is in operation or while the fans are still cycling Do not turn the heater off by unplugging it from the wa...

Страница 11: ...t should be permanently removed For protection of children or the infirm a secondary guard is recommended DO NOT CONNECT TO AN LPG GAS CYLINDER INDOORS DO NOT PLACE ARTICLES ON OR AGAINST THIS APPLIAN...

Страница 12: ...urned on Ensure gas supply is turned on Re ignite when power has been restored Repeat lighting procedure refer page 2 Smell of gas Leaking gas Turn off gas at meter and call installer Fan not working...

Страница 13: ...ON again If the Error Message still remains or returns on the next operation please contact your nearest service contact and arrange for a service call Error Code Probable Cause Comments Ignition Fail...

Страница 14: ...s adequate fixed ventilation this fixed ventilation must be provided as detailed in AS NZS 5601 6 This appliance must not be installed where curtains or other combustible materials could come into con...

Страница 15: ...where curtains or other combustible materials could come into contact with it In some cases curtains may need restraining See below for minimum clearances required 5 This heater is not designed to be...

Страница 16: ...Royale Freestanding ETR 14 Issue 3 Rinnai...

Страница 17: ...Use FLFKIT05 FLFTWKIT minimum of 3 metres of flue to be installed Rinnai appliance warranty conditions will be voided if non Rinnai flue components are fitted Rinnai appliances are NOT CERTIFIED for u...

Страница 18: ...Royale Freestanding ETR 15 Issue 3 Rinnai INSTALLERS INFORMATION DIMENSIONS...

Страница 19: ...s Supply Secure the heater 1 Secure the heater to the floor with 2 suitable fixings through the holes located on the rear of the base plate 2 Attach gas supply Note to the supplied fitting union All f...

Страница 20: ...rial in front of the Front Log Do not pour as dust particles from the plastic bag as it may block the burner ports Level it with a pencil or screw driver and remove excess material Note The ember bed...

Страница 21: ...ing on Page 9 before contacting your local service contacts listed on the back page of this booklet It may take approximately 2 hours of operation for the logs to achieve their full flame pattern and...

Страница 22: ...VER TRANSFORMER 6 5 4 1 1 3 ROOM TEMP THERMISTER XLP 04V XMP 03V OVER HEAT THERMISTER BK 2 3 REMOTE UNIT 10P 8P 917694 1 917692 1 YLR 03V BR BL BK BK BL BL R BK R R BL BL 1 1 10 8 10KR 8M Y SV3 SV2 SV...

Страница 23: ...lly aware of operating procedure Company name ____________________________________________________ Installers name ____________________________________________________ Address ________________________...

Страница 24: ...om mobile or public phones Australia Pty Ltd ABN 74 005 138 769 Internet www rinnai com au E mail enquiry rinnai com au Internet www rinnai co nz E mail sales rinnai co nz Head Office New Zealand 691...

Отзывы: