Rinnai HD210E Скачать руководство пользователя страница 15

Rinnai 15 

Commercial Manifold Pack OIM

Wall mounting or floor mounting of the heat source is possible.

 

Wall mounting -

 drill holes in the wall in the desired location and mount the frame to the wall using suitable fixings. 

A useful nominal height is 1500mm (height of the frame) from floor level. This is subject to site requirements, the 

desired location of the flue terminal in reference to AS/NZS5601 (refer to page 10) and service accessibility. If 

you are installing an internal plant, flue design and the associated wall or roof penetrations need to be considered 

as the centre distance between the heaters varies depending on which heater is being installed. Refer to the 

drawings and specifications section on page 17 for dimensional information.

Floor mounting -

 you will require the appropriate number of DDBASE supports to enable suitable floor mounting. 

DDBASE requires some minor assembly using the brackets and fixings provided. Every module of either 2 or 3 

heaters requires one DDBASE and it is recommended to assemble the DDBASE to the heat source module(s) prior 

to joining the pipework. The heat source can also be installed in a back to back configuration using DDFJOINKIT.
Again if you are installing an internal plant, flue design and the associated wall or roof penetrations need to be 

considered as the centre distance between the heaters varies depending on which heater is being installed. Refer 

to the drawings and specifications section on page 17 for dimensional information.

NOTE

When passing the flues through the mounting wall, it may be necessary to attach them to the 

water heater before securing the water heater to the wall.

Specifically engineered systems mounted on a skid base do not require any assembly of the heat source unless it 

has been split purely for transport purposes. If this is the case the pipe connections will be marked up accordingly 

to aid the assembly process.

Manifold Packs have a staging system consisting of either a Manifold Electronic Control System (MECS) or 

Cascade System. MECS and Cascade are sophisticated electronic control systems that are supplied pre-wired 

except for the module connections. Refer to the separate installation booklet supplied for full details on how to 

connect each heater control. 

Optional Base

(DDBASE)

INSTALLATION INSTRUCTIONS

Содержание HD210E

Страница 1: ...Commercial Manifold Pack Operation Installation Manual...

Страница 2: ...spection and Maintenance Not suitable as a pool or spa heater This manual must be read and understood before installation commissioning and operation of water heaters and flue systems are attempted Th...

Страница 3: ...or Internal Models 11 Multiple Flue Terminals 12 Installation Options 13 Manifold Pack with no reticulation system 16 Manifold Pack with reticulation system 16 Specifications 17 Typical Rinnai Manifol...

Страница 4: ...fore reading the manufacturers instructions This appliance must be installed commissioned and serviced by an authorised person in accordance with all applicable local rules and regulations For continu...

Страница 5: ...ce is NOT intended for use by persons including children with reduced physical sensory or mental capabilities or lack of experience and knowledge unless they have been given supervision or instruction...

Страница 6: ...ldren disabled and the elderly are at the highest risk of being scalded Feel water temperature before bathing or showering Scalds from hot water taps can result in severe injuries to young children Sc...

Страница 7: ...sers are surprised at the amount of hot water used especially when showering If the amount of hot water used during the day exceeds the capacity of the hot water system it is likely that there will be...

Страница 8: ...he same MJ rating HD28E HD250E HD210E EXTERNAL MODELS These appliances are designed for Outdoor Installation only As such each must be located in an above ground open air situation with natural ventil...

Страница 9: ...t be in accordance with Section 6 of AS NZS 5601 and the FLUEING FOR INTERNAL MODELS on page 11 HORIZONTAL OBSTRUCTIONS AS NZS 5601 2010 Gas Installations stipulates a minimum horizontal clearance of...

Страница 10: ...her projections FIGURE 6 2 in part LOCATION OF FLUE TERMINALS OF BALANCED FLUE ROOM SEALED FAN ASSISTED OR OUTDOOR APPLIANCES n j Horizontally from an openable window door non mechanical air inlet or...

Страница 11: ...g can be used as a direct wall flue or extended from another internal wall Vertical flueing is used when the water heater needs to be flued vertically through the roof A condensate trap may be require...

Страница 12: ...FLUE TERMINALS Dimension H in AS NZS 5601 Figure 6 2 does not apply when multiple Rinnai external water heaters of the same model are installed on the same vertical face with flue terminals at the sam...

Страница 13: ...Installation Manual RINNAI FLUE HEADER S NATURAL DRAFT FLUE PIPE SUPPLIED BY OTHERS ALREADY INSTALLED CERTIFIED FLUE COWL CONDENSATE DRAIN WHERE NECESSARY RINNAI ADJUSTABLE SLEEVE OR EQUIVALENT MULTIP...

Страница 14: ...is supplied in modules of either 2 or 3 HD continuous flow units plumbed in parallel and mounted on a dedicated and lightweight frame Standard systems can be installed together in any order by couplin...

Страница 15: ...rce module s prior to joining the pipework The heat source can also be installed in a back to back configuration using DDFJOINKIT Again if you are installing an internal plant flue design and the asso...

Страница 16: ...close the cold water valve underneath the currently operating heaters to restrict the flow Other heaters should then fire up Clean all filters on completion MANIFOLD PACK WITH RETICULATION SYSTEM Tur...

Страница 17: ...eight HD200 Manifold Packs MP2 28 375 750 280 340 440 540 1500 850 60 Kg MP3 28 1125 90 Kg MP4 28 1500 120 Kg MP5 28 1875 150 Kg MP6 28 2250 180 Kg HD210 Manifold Packs MP2 210 500 1000 310 340 440 54...

Страница 18: ...ards the cold pipe should be insulated Gas Supply Check gas type of Rinnai HD water heater matches gas supply available LPG or Natural on job site Gas inlet connection is the top pipe on a MP manifold...

Страница 19: ...fore increasing the flow rate through the remaining heaters Extra heaters are fired as the flow rate increases The staging control system also rotates the sequence of operation to share the load acros...

Страница 20: ...linder Check there are no obstructions to the flue outlet 14 Heat Exchanger Overheat Failure Service Call 15 Venturi Control Failure Service Call 16 Over Temperature Warning Service Call 17 Venturi Bl...

Страница 21: ...d by Rinnai Co axial flueing not being pushed together properly and exhaust gases are re entering the inlet air Check flue connections Also inspect flue terminal for any cause to divert exhaust air ba...

Страница 22: ...Installed Yes No Return Strainer Installed Yes No NA Storage Tanks hydraulically balanced Yes No NA Ventilation Requirements Satisfactory Yes No Individual Co Axil Flue Installation Satisfactory Yes...

Страница 23: ...three monthly from there onwards For other details refer to Operation Maintenance Manual For effective operation of the system service the package once every six 6 months as per the manufacturer s in...

Страница 24: ...e Tel 1800 000 340 Cost of a local call higher from mobile or public phones For further information visit www rinnai com au or email enquiry rinnai com au Rinnai has a Service and Spare Parts network...

Отзывы: