Commercial Manifold Pack OIM

HORIZONTAL FLUE TERMINAL CLEARANCES (EXTRACT FROM AS/NZS 5601)

Min. Clearances (mm) 

For 

appliances

 up to 50 MJ/h input

200

300

For 

appliances

 over 50 MJ/h input

300

500

300

300

e

c

a

fr

u

r

e

h

t

o

 r

o

 y

n

o

cl

a

b

 

a

 

e

v

o

b

a

 ,

d

n

u

o

r

g

 

e

h

m

o

r

F

b

300

500

r

e

n

r

o

la

n

r

e

tx

e

 r

o

 ll

a

w

 

n

r

u

t

e

a

 t

n

o

r

F

c

d

From a 

gas meter 

(M) (see Note 5)

(see Clause 5.11.5.9 for vent terminal location of regulator)

(see Table 6.7 for New Zealand requirements)

 

1000

1000

e From an electricity 

meter

 or fuse box (P) † (see Note 5)

500

500

e

pi

p

 li

o

r

o

 

e

pi

p

 

ni

a

r

d

 

a

 

m

o

r

F

f

g Horizontally from any building structure* = or obstruction facing a terminal

500

500

h From any other 

flue terminal

, cowl, or combustion air intake *

300

500

Appliances 

up to 150 MJ/h input *

300

500

Appliances 

over 150 MJ/h input up to 200 MJ/h input *

300

1500

Appliances 

over 200 MJ/h input up to 250 MJ/h input *

500

1500

Appliances

 over 250 MJ/h input  *

1500

1500

All fan-assisted 

flue appliances

, in the direction of discharge

1500

-

1000

1500

r

e

w

ol

b

 

a

p

a

 

g

ni

d

ul

c

ni

 ,

t

el

ni

 r

ia

 l

a

ci

n

a

h

c

e

m

 

a

 

m

o

r

F

k

Space heaters up to 50 MJ/hr input

Other 

appliances

 up to 50 MJ/hr input 

500

500

Appliances

 over 50 MJ/h input and up to 150 MJ/h input

1000

1000

Appliances

 over 150 MJ/h input

1500

1500

m

e

tI

.f

e

R

a

Below eaves, balconies and other projections:

FIGURE 6.2 (in-part)      LOCATION OF FLUE TERMINALS OF BALANCED FLUE,

ROOM-SEALED, FAN-ASSISTED OR OUTDOOR APPLIANCES

n

j

Horizontally from an openable window, door, non-mechanical air inlet, or any other opening into a building with the 

exception of sub-floor ventilation: 

Vertically below an openable window, non-mechanical air inlet, or any other opening into a building with the 

exception of sub-floor ventilation:

Where dimensions 

c, j 

or

 k

 cannot be achieved an equivalent horizontal distance measured

diagonally from the nearest discharge point of the terminal to the opening may be deemed by

the 

Technical Regulator

 to comply. 

See Clause 6.9.4 for restrictions on a

 flue terminal

 under a covered area.

See Figure J3 for clearances required from a 

flue terminal

 to an 

LP Gas cylinder

.  A

flue terminal

 is considered to be a source of ignition.

For 

minimum clearances 

not addressed above acceptance should be obtained from the 

Technical Regulator

.

Minimum clearances

 d 

and

 e 

also apply to any combustion air intake openings of appliances.

1

2

3

4

5

*   Unless 

appliance 

is 

certified 

for closer installation.

†  Prohibited area below electricity meter or fuse box extends to ground level. 

NOTES:

75

150

Shading  indicates prohibited
area for  flue terminals

LEGEND:

I

   =  Mechanical  air inlet

S

  =  Structure

M

  =  Gas meter

T

   =  Flue terminal

P

   =  Electricit y  meter  or  fuse  box

Z

   =  Fan-assisted  appliance only

Direction of

discharge

See Note 1

See Note 1

Opening into

a building

T

T

T

T

T

T

T

C

M

d

d

e

e

h

j

j

j

n

b

f

a

h

P

Z

S

k

k

g

g

g

I

T

Door

 

Fan assisted

Natural draft

150

150

INSTALLATION INSTRUCTIONS

Содержание HD210E

Страница 1: ...Commercial Manifold Pack Operation Installation Manual...

Страница 2: ...spection and Maintenance Not suitable as a pool or spa heater This manual must be read and understood before installation commissioning and operation of water heaters and flue systems are attempted Th...

Страница 3: ...or Internal Models 11 Multiple Flue Terminals 12 Installation Options 13 Manifold Pack with no reticulation system 16 Manifold Pack with reticulation system 16 Specifications 17 Typical Rinnai Manifol...

Страница 4: ...fore reading the manufacturers instructions This appliance must be installed commissioned and serviced by an authorised person in accordance with all applicable local rules and regulations For continu...

Страница 5: ...ce is NOT intended for use by persons including children with reduced physical sensory or mental capabilities or lack of experience and knowledge unless they have been given supervision or instruction...

Страница 6: ...ldren disabled and the elderly are at the highest risk of being scalded Feel water temperature before bathing or showering Scalds from hot water taps can result in severe injuries to young children Sc...

Страница 7: ...sers are surprised at the amount of hot water used especially when showering If the amount of hot water used during the day exceeds the capacity of the hot water system it is likely that there will be...

Страница 8: ...he same MJ rating HD28E HD250E HD210E EXTERNAL MODELS These appliances are designed for Outdoor Installation only As such each must be located in an above ground open air situation with natural ventil...

Страница 9: ...t be in accordance with Section 6 of AS NZS 5601 and the FLUEING FOR INTERNAL MODELS on page 11 HORIZONTAL OBSTRUCTIONS AS NZS 5601 2010 Gas Installations stipulates a minimum horizontal clearance of...

Страница 10: ...her projections FIGURE 6 2 in part LOCATION OF FLUE TERMINALS OF BALANCED FLUE ROOM SEALED FAN ASSISTED OR OUTDOOR APPLIANCES n j Horizontally from an openable window door non mechanical air inlet or...

Страница 11: ...g can be used as a direct wall flue or extended from another internal wall Vertical flueing is used when the water heater needs to be flued vertically through the roof A condensate trap may be require...

Страница 12: ...FLUE TERMINALS Dimension H in AS NZS 5601 Figure 6 2 does not apply when multiple Rinnai external water heaters of the same model are installed on the same vertical face with flue terminals at the sam...

Страница 13: ...Installation Manual RINNAI FLUE HEADER S NATURAL DRAFT FLUE PIPE SUPPLIED BY OTHERS ALREADY INSTALLED CERTIFIED FLUE COWL CONDENSATE DRAIN WHERE NECESSARY RINNAI ADJUSTABLE SLEEVE OR EQUIVALENT MULTIP...

Страница 14: ...is supplied in modules of either 2 or 3 HD continuous flow units plumbed in parallel and mounted on a dedicated and lightweight frame Standard systems can be installed together in any order by couplin...

Страница 15: ...rce module s prior to joining the pipework The heat source can also be installed in a back to back configuration using DDFJOINKIT Again if you are installing an internal plant flue design and the asso...

Страница 16: ...close the cold water valve underneath the currently operating heaters to restrict the flow Other heaters should then fire up Clean all filters on completion MANIFOLD PACK WITH RETICULATION SYSTEM Tur...

Страница 17: ...eight HD200 Manifold Packs MP2 28 375 750 280 340 440 540 1500 850 60 Kg MP3 28 1125 90 Kg MP4 28 1500 120 Kg MP5 28 1875 150 Kg MP6 28 2250 180 Kg HD210 Manifold Packs MP2 210 500 1000 310 340 440 54...

Страница 18: ...ards the cold pipe should be insulated Gas Supply Check gas type of Rinnai HD water heater matches gas supply available LPG or Natural on job site Gas inlet connection is the top pipe on a MP manifold...

Страница 19: ...fore increasing the flow rate through the remaining heaters Extra heaters are fired as the flow rate increases The staging control system also rotates the sequence of operation to share the load acros...

Страница 20: ...linder Check there are no obstructions to the flue outlet 14 Heat Exchanger Overheat Failure Service Call 15 Venturi Control Failure Service Call 16 Over Temperature Warning Service Call 17 Venturi Bl...

Страница 21: ...d by Rinnai Co axial flueing not being pushed together properly and exhaust gases are re entering the inlet air Check flue connections Also inspect flue terminal for any cause to divert exhaust air ba...

Страница 22: ...Installed Yes No Return Strainer Installed Yes No NA Storage Tanks hydraulically balanced Yes No NA Ventilation Requirements Satisfactory Yes No Individual Co Axil Flue Installation Satisfactory Yes...

Страница 23: ...three monthly from there onwards For other details refer to Operation Maintenance Manual For effective operation of the system service the package once every six 6 months as per the manufacturer s in...

Страница 24: ...e Tel 1800 000 340 Cost of a local call higher from mobile or public phones For further information visit www rinnai com au or email enquiry rinnai com au Rinnai has a Service and Spare Parts network...

Отзывы: