42
Furnace Preparation
INSTALLING THE LEFT AND
RIGHT BACK SPACERS
The left and right back spacers are
installed with a tab and slot at the
top and middle and single screws
at the bottom of the panels.
Ensure two locking
tabs align correctly
Secure one screw at
the bottom of each
side back spacer
ROOM AIR THERMISTOR
NOTE:
The room air thermistor
comes with approximately 14” of
wire. It can be moved higher if
needed if there is an excessive
amount of cold air conduction
present. This should be a last
resort
—ideally, the cold air
conduction should be eliminated.
Room air
thermistor
(yellow wires)-
can be raised
several inches
if needed
Содержание Energysaver ES38
Страница 1: ...Rinnai ENERGYSAVER Direct Vent Wall Furnace Installation Fundamentals ...
Страница 30: ...30 View of Properly Installed Unit ...
Страница 50: ...50 Vent Termination OUTSIDE VIEW OF CORRECTLY INSTALLED TERMINATION ...
Страница 60: ...60 Extended Venting And High Altitude Installation Procedures ...
Страница 74: ...74 Decorative Covers For Vent Extension Kits ...