48
Vent Termination
INSTALLING THE OUTER VENT TERMINAL
1. From the
outside, insert
the terminal into
the sleeve with
the marking
“TOP” at the top.
The left hand
side locking tie
should be
marked “LEFT.”
2. For weather
board walls (lap
siding), add the
second seal next
to the terminal
seal to
compensate for
siding angle.
Practice good safety habits when using
power equipment and sharp tools!
CAUTION
3. On the inside,
pull hard on the
left and right
hand ties. Clip
the ties over the
notches inside
the sleeve. The
ties should pull 2
or 3 notches
past the starting
point.
4. Cut the ties,
leaving about ¾”
(20mm) past the
notch. Bend the
excess back and
parallel to the
wall.
Terminal Seal
Additional angled
seal for lap siding
Lock in notches
Содержание Energysaver ES38
Страница 1: ...Rinnai ENERGYSAVER Direct Vent Wall Furnace Installation Fundamentals ...
Страница 30: ...30 View of Properly Installed Unit ...
Страница 50: ...50 Vent Termination OUTSIDE VIEW OF CORRECTLY INSTALLED TERMINATION ...
Страница 60: ...60 Extended Venting And High Altitude Installation Procedures ...
Страница 74: ...74 Decorative Covers For Vent Extension Kits ...