Installation and operating instructions for
Rail Clamp DR 085/088 FHM
spring activated
– hydraulically released
E 09.797e
Issue: 14.09.2022
Version: 2
Drawn: BAHS
Checked: OHLM
Pages: 39
Page: 7
2.2.3 Installing pads with guide rollers
1. Check screws
V1
and
V2
. Make sure they do not extend into the inside of the roller support.
Do the same for
V3
and remove it, if necessary.
Fig. 2.3
2. Place assembly in the greased slots of the clamp lever ensuring that the roller screw heads
are facing upwards.
Fig. 2.4
3. Screw the 2 screws
V1
and
V2
until they come into contact with the bottom of the lever
lamages.
Fig. 2.5
V1
V3
V2
V1
V2