Installation and operating instructions for
Rail Clamp DR 085/088 FHM
spring activated
– hydraulically released
E 09.797e
Issue: 14.09.2022
Version: 2
Drawn: BAHS
Checked: OHLM
Pages: 39
Page: 27
Maintenance frequency
Standard environnement
Hard working environment*
Maintenance level 1
Every year
Every 3 months
Maintenance level 2
Every 2 years
Every year
Maintenance level 3
Every 10 years
Every 7 years
*Hard working environment: Rail clamp subject tob be in contact with seawater, in sea sprays.
4.1 Maintenance level 1
It is necessary to check the following points:
1. Ensure that the rail brake is movable on these 2 pins. If necessary, clean and
lubricate the following parts:
Remove the pads See chapter 5.4.Swing completely the rail clamp on one side, clean and
lubricate the following part (see Fig. 4.1 and Fig. 4.2).
Contact faces between levers and support
Support
Axis of lateral compliance
Fig. 4.1